SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Heto Modular Wall Formwork Solution for Concrete Structure Construction
US$85.00-140.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on-Site Supervision

Warranty

1year

System Type

Steel Panel Wall/ Column Formwork

Material

Q355 Steel Profile

H/Hm Panel Heights

3.0, 2.4, 1.5, 1.2 M

H/Hm Panel Widths

0.9, 0.75, 0.5, 0.35 M

H Panel Weight

35.3 Kg/Sqm

Hm Panel Weight

40 Kg/Sqm

Max Panel Size

3*0.9 M

Panel Depth

73 mm

Max Permissible Fresh Concrete Pressure

60 kN/Sqm(Wall); 80 kN/Sqm(Column)

Installation Time

100-200 Sqm/2 Person/Day

Formlining

15 mm Tecon-Form Birch Plywood

Surface Treatment

Powder-Coated

Connection Technology

Alignment Hc Coupler; Clamps; Column Coupler

Load Quantity

Around 580 Sqm/40hq Container; 45 Sets/40 Hq

Handling Method

Tower Crane

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Automatic Welding Technology: Ensures high precision and structural integrity in steel frame production.
On-Site Supervision Service: Available for most global projects to ensure proper installation and safety.
SGS Standard Compliance: Product meets international quality standards verified by SGS certification.
Special Coating Finish: Powder coated surface treatment provides durability and corrosion resistance.
Customized Packing Options: Available by pallet or customized to suit specific container transportation needs.
Extensive Stock Availability: 5000 sqm plastic formwork, 2000 sqm frame formwork, and Alu-Flex slab formwork ready to ship.
Buy-Back System Support: Offered for medium and big scale projects to reduce client costs.
Global Agent Network: Seeking worldwide agents and distributors based on win-win business relationships.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Modular Concrete Slab Formwork for Construction

Tecon Modular Concrete Slab Formwork for Construction

US$50.00-150.00
300 Square Meters(MOQ)
Made-in-China.com
PVC Formwork Profile for Robust Concrete Wall Solutions
Made-in-China.com
Tecon Steel Frame Modular System Formwork for Wall Column Concrete
Made-in-China.com
Aluminum Formworks Prefabricate for Concrete Construction
Made-in-China.com