SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Heto Reusable Steel Frame Wall Formwork Adjustable Column Formwork for Concrete Building Construction
US$85.00-140.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on-Site Supervision

Warranty

1 Year

Model NO.

TECON HETO Formwork

Material

Q355 Steel Profile

Panel Weight

40 Kg/M2

Max Panel Size

3*0.9 M

Panel Depth

73 mm

Max Permissible Fresh Concrete Pressure

80 kN/M2

Installation Time

100 M²/2 Person/Day

Formlining

15 mm Tecon-Form Birch Plywood

Connection Technology

Column Couplers

Load Quantity

Around 45 Sets Per 40hq Container

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

On-Site Supervision: Available for most projects worldwide with specific regional restrictions.
Q355 Steel Profile Material: Constructed with high-strength Q355 steel profiles for durability.
Large Stock Availability: 5000 sqm plastic formwork, 2000 sqm HETO frame formwork, and Alu-Flex slab formwork ready to ship.
Flexible Lead Times: 10-15 days for stock items, 15-25 days for timber beams, 30-45 days for other systems.
Buy-Back System: Available for selected medium and large-scale projects.
Global Agent Network: Seeking agents and distributors worldwide based on win-win relationships.
Standard Packaging: Utilizes standard steel and wooden pallets suitable for container transportation.
Comprehensive Purchase Process: Structured 9-step process from PI confirmation to site supervision and document submission.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tecon Steel Frame Panel Formwork with Hdo Plywood

Tecon Steel Frame Panel Formwork with Hdo Plywood

US$85.00-140.00
300 Square Meters(MOQ)
Made-in-China.com
Competitive Price Tecon Steel Frame Modular Column Wall Formwork
Made-in-China.com
Tecon Competitive Price Steel Frame Modular Column Wall Formwork
Made-in-China.com