Powered by Made-in-China.com

Tecon Heto Reusable Steel Frame Wall Formwork Adjustable Column Formwork for Concrete Building Construction
US$85.00-140.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on-Site SupervisionWarranty
1 YearModel NO.
TECON HETO FormworkMaterial
Q355 Steel ProfilePanel Weight
40 Kg/M2Max Panel Size
3*0.9 MPanel Depth
73 mmMax Permissible Fresh Concrete Pressure
80 kN/M2Installation Time
100 M²/2 Person/DayFormlining
15 mm Tecon-Form Birch PlywoodConnection Technology
Column CouplersLoad Quantity
Around 45 Sets Per 40hq ContainerTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
730840Production Capacity
500000sqm/ YearKey features
On-Site Supervision: Available for most projects worldwide with specific regional restrictions.
Q355 Steel Profile Material: Constructed with high-strength Q355 steel profiles for durability.
Large Stock Availability: 5000 sqm plastic formwork, 2000 sqm HETO frame formwork, and Alu-Flex slab formwork ready to ship.
Flexible Lead Times: 10-15 days for stock items, 15-25 days for timber beams, 30-45 days for other systems.
Buy-Back System: Available for selected medium and large-scale projects.
Global Agent Network: Seeking agents and distributors worldwide based on win-win relationships.
Standard Packaging: Utilizes standard steel and wooden pallets suitable for container transportation.
Comprehensive Purchase Process: Structured 9-step process from PI confirmation to site supervision and document submission.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Cost Effective H20 Adjustable Scaffold Frame for Formwork Construction
US$12.66-13.93
100 Pieces(MOQ)
High-Strength Reusable H20 Timber I-Joist for Concrete Formwork and Construction Support
US$8.56-10.56
100 Pieces(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
High-Quality Waterproof H20 Timber Beam with Steel-Reinforced I-Joist for Building Formwork
US$8.56-10.56
100 Pieces(MOQ)
High-Strength H20 Timber I-Joist with Lightweight Plywood Web for Reusable Formwork
US$8.56-10.56
100 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Reusable Plastic Construction Formwork for Concrete Wall Construction Cheap
US$20.00-55.00
200 PCS(MOQ)
PVC Formwork for Concrete Wall with Long-Lasting UC-Resistance
US$1,150.00-1,170.00
10 Tons(MOQ)
High-Quality Durable Plastic Formwork for Columns and Beams
US$20.00-55.00
200 PCS(MOQ)
Tecon Steel Frame Panel Formwork with Hdo Plywood
US$85.00-140.00
300 Square Meters(MOQ)
Innovative PVC Formwork Profile for Permanent Wall Systems and Structures
US$1,150.00-1,170.00
10 Tons(MOQ)
Competitive Price Tecon Steel Frame Modular Column Wall Formwork
US$85.00-140.00
300 Square Meters(MOQ)
Efficient PVC Insulated Formwork for Permanent Wall Construction Needs
US$1,150.00-1,170.00
10 Tons(MOQ)
Durable Slab Formwork with Online Technical Support for Apartment Construction
US$65.00
250 Square Meters(MOQ)
Reusable Plastic Construction Stair Formwork for Wholesale with Online Support
US$20.00-55.00
200 PCS(MOQ)
Tecon Reusable Steel Frame Formwork for Concrete for Walls/Slab/Columns
US$85.00-140.00
300 Square Meters(MOQ)
Versatile PVC Insulated Formwork for Efficient Permanent Wall Construction
US$35.00
600 Sets(MOQ)
Tecon Competitive Price Steel Frame Modular Column Wall Formwork
US$85.00-140.00
300 Square Meters(MOQ)



















