SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Heto Steel Frame Formwork for Wall and Column Adjustable Column Formwork for Concrete Construction
US$85.00-140.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on-Site Supervision

Material

Q355 Steel Profile

Max Panel Size

3*0.9 M

Panel Depth

73 mm

Max Permissible Fresh Concrete Pressure

80 kN/M2

Installation Time

100 M²/2 Person/Day

Formlining

15 mm Tecon-Form Birch Plywood

Connection Technology

Column Couplers

Handling Method

Tower Crane

Load Quantity

Around 45 Sets Per 40hq Container

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

On-Site Supervision: Provided for most projects worldwide except restricted regions.
Q355 Steel Profile Material: High-strength steel profile ensures durability and safety.
Adjustable Column Formwork: Designed for versatile concrete construction applications.
Fast Installation Rate: Capable of installing 100 square meters per day with two personnel.
High Load Capacity: Supports fresh concrete pressure up to 80 kN/M2.
Stock Availability: 5000 sqm plastic formwork and 2000 sqm frame formwork ready to ship.
Buy-Back System: Available for select medium and large-scale projects.
Global Agent Network: Seeking worldwide agents and distributors based on win-win relationships.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list, or simply send us the structural drawing and project information for a complete formwork & scaffolding proposal.
Q:What is the payment term?
A:
We accept payment by T/T or L/C.
Q:Are you a factory?
A:
Yes, we are a factory.
Q:Do you have in stock?
A:
Yes, we have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork: 10 to 15 days. For H20 timber beam, TECON-Form Shuttering: 15 to 25 days. For other systems: 30 to 45 days. Please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Competitive Price Steel Frame Modular Column Wall Formwork
Made-in-China.com
Competitive Price Tecon Steel Frame Modular Column Wall Formwork
Made-in-China.com
Soft-Hard PVC Extrusion Formwork for Durable Concrete Walls
Made-in-China.com
Tecon Steel Frame Modular System Formwork for Wall Column Concrete
Made-in-China.com
PVC Formwork Profile for Robust Concrete Wall Solutions
Made-in-China.com