SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Low Price Sef-Climbing Formwork for High-Rise Building Construction
US$3,000.00-5,000.00
2 Sets

Product profile

Customization

Available

After-sales Service

on- Site Supervision

High Carring Capacity

80kn Per Cylinder

Model NO.

TECON Self-climbing Formwork

Speed

0.5 Hours Per Climbing

Hight

4.5m, 5m, >5m

Product Name

Hydraulic Self-Climbing Steel Formwork for Constru

Feature

Steady&High-Safety Progress During Self-Climbing

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

848060

Production Capacity

50000sets/ Year

Key features

Automatic Self-Climbing: Climbs automatically without the need for a crane lift, ensuring high efficiency.
High Safety System: Features double embedding anchor system and climbing shoe for trustful safety.
High Reutilization Rate: Reutilization rate up to 90% from different projects, offering cost savings.
Fast Climbing Speed: Climbing speed per floor is around 0.5 hours for rapid construction progress.
Customized Planning: Adapts to different geometry plans and floor heights via customized planning.
High Carrying Capacity: Supports 80kN per cylinder with simultaneous operation of 2 or 3 steps.
Comprehensive On-Site Support: Includes shop drawings, user manuals, and supervisor training at your site.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:Does the formwork require a crane for climbing?
A:
No, the self-climbing platform can climb automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed per floor is around 0.5 hours.
Q:Can the system be customized for different building geometries?
A:
Yes, the system adapts to different geometry plans and floor heights via customized planning.
Q:What is the reutilization rate of this formwork?
A:
The reutilization rate is up to 90% from different projects.
Q:What safety features does the system include?
A:
It features a double embedding anchor system and climbing shoe for trustful safety.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Climbing System Climbing Formwork for Construction
Made-in-China.com