Powered by Made-in-China.com
Tecon Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building
US$3,000.00-5,000.00
2 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionHigh Carring Capacity
80kn Per CylinderModel NO.
TECON Self-climbing FormworkSpeed
0.5 Hours Per ClimbingHight
4.5m, 5m, >5mProduct Name
Hydraulic Self-Climbing Steel Formwork for ConstruFeature
Steady&High-Safety Progress During Self-ClimbingTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
50000sets/ YearKey features
Automatic Self-Climbing: Climbs automatically without needing a crane lift for efficient high-rise construction.
High Safety & Stability: Features double embedding anchor system and climbing shoes for steady progress.
Fast Climbing Speed: Climbs around 0.5 hours per floor, significantly speeding up project timelines.
High Reutilization Rate: Up to 90% reutilization rate from different projects, reducing material costs.
Customizable Dimensions: Platform height adapts to 3-5 times storey height; planning customized for geometry.
Sealed Protection System: Fully sealed outer protection minimizes weather effects and ensures site safety.
Comprehensive On-Site Support: Includes shop drawings, user manuals, and supervisor training for site supervision.
Versatile Application: Suitable for structural concreting, plastering, painting, and various civil projects.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Does the formwork require a crane for climbing?
A:
No, the self-climbing platform climbs automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed is around 0.5 hours per floor.
Q:What is the carrying capacity of the operation layer?
A:
It supports simultaneous operation of 2 steps at 3 kN per cubic meter, or 3 steps at 2 kN per cubic meter.
Q:Can the platform height be customized?
A:
Yes, the platform height can be adapted to 3 to 5 times the storey height, typically ranging from 12m to 18m.
Q:What safety features are included?
A:
It features a double embedding anchor system and climbing shoes for trustful safety and steady progress.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Manufacturer-Direct H20 Timber I-Joist with Waterproof WBP Glue for Building Formwork
US$8.56-10.56
100 Pieces(MOQ)
High-Strength H20 Timber Joist with I-Beam Profile for Building Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
Premium H20 Timber I-Joist with High-Strength Flanges for Building and Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
H20 I-Joist Timber Beam with High-Strength Design for Wall Slab and Formwork
US$8.56-10.56
100 Pieces(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Aluminum Formwork Fabrication for High-Rise Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Aluminum Building Formwork/Framework Extrusion Profile for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Versatile Plastic Formwork Panels for Building and Construction
US$20.00-55.00
200 PCS(MOQ)
Extruding Aluminium Profiles of High Rise Building Formwork System
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Climbing System Climbing Formwork for Construction
US$3,000.00-5,000.00
2 Sets(MOQ)
Aluminum Building Formwork Extrusion Profile for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Automatic Hydraulic Self-Climbing Formwork for Core Wall
US$3,000.00-5,000.00
2 Sets(MOQ)
Waterproof Plastic Construction Formwork for Outdoor Building Applications Wholesale
US$20.00-55.00
200 PCS(MOQ)
High-Performance Slab Formwork with Total Support for Apartment Building Projects
US$65.00
250 Square Meters(MOQ)



















