SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building
US$3,000.00-5,000.00
2 Sets

Product profile

Customization

Available

After-sales Service

on- Site Supervision

High Carring Capacity

80kn Per Cylinder

Model NO.

TECON Self-climbing Formwork

Speed

0.5 Hours Per Climbing

Hight

4.5m, 5m, >5m

Product Name

Hydraulic Self-Climbing Steel Formwork for Constru

Feature

Steady&High-Safety Progress During Self-Climbing

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

848060

Production Capacity

50000sets/ Year

Key features

Automatic Self-Climbing: Climbs automatically without needing a crane lift for efficient high-rise construction.
High Safety & Stability: Features double embedding anchor system and climbing shoes for steady progress.
Fast Climbing Speed: Climbs around 0.5 hours per floor, significantly speeding up project timelines.
High Reutilization Rate: Up to 90% reutilization rate from different projects, reducing material costs.
Customizable Dimensions: Platform height adapts to 3-5 times storey height; planning customized for geometry.
Sealed Protection System: Fully sealed outer protection minimizes weather effects and ensures site safety.
Comprehensive On-Site Support: Includes shop drawings, user manuals, and supervisor training for site supervision.
Versatile Application: Suitable for structural concreting, plastering, painting, and various civil projects.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:Does the formwork require a crane for climbing?
A:
No, the self-climbing platform climbs automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed is around 0.5 hours per floor.
Q:What is the carrying capacity of the operation layer?
A:
It supports simultaneous operation of 2 steps at 3 kN per cubic meter, or 3 steps at 2 kN per cubic meter.
Q:Can the platform height be customized?
A:
Yes, the platform height can be adapted to 3 to 5 times the storey height, typically ranging from 12m to 18m.
Q:What safety features are included?
A:
It features a double embedding anchor system and climbing shoes for trustful safety and steady progress.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Climbing System Climbing Formwork for Construction
Made-in-China.com