Powered by Made-in-China.com
Tecon Metal Concrete Steel Frame Column Formwork Construction
US$85.00-140.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on-Site SupervisionWarranty
1 YearModel NO.
TECON HETO FormworkSystem Type
Steel Panel Wall FormworkMaterial
Q355 Steel ProfileH/Hm Panel Heights
3.0, 2.4, 1.5, 1.2 MH/Hm Panel Widths
0.9, 0.75, 0.5, 0.35 MH Panel Weight
35.3 Kg/SqmHm Panel Weight
40 Kg/SqmMax Panel Size
3*0.9 MPanel Depth
73 mmMax Permissible Fresh Concrete Pressure
60 kN/Sqm(Wall); 80 kN/Sqm(Column)Installation Time
100-200 Sqm/2 Person/DayFormlining
15 mm Tecon-Form Birch PlywoodSurface Treatment
Powder-CoatedConnection Technology
Alignment Hc Coupler; Clamps; Column CouplerLoad Quantity
Around 580 Sqm/40hq Container; 45 Sets/40 HqHandling Method
Tower CraneTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
730840Production Capacity
500000sqm/ YearKey features
Advanced Automatic Welding: Utilizes automatic welding technology for superior structural integrity and precision.
Comprehensive On-Site Supervision: Provides on-site supervision services for most global projects to ensure safety and quality.
Diverse Material Composition: Constructed from high-quality steel and plywood for durability in concrete pouring.
Extensive Stock Availability: Maintains 5000 sqm plastic formwork, 2000 sqm frame formwork, and Alu-Flex in stock.
Customized Packaging Options: Offers standard steel or wooden pallets, with packaging customizable to specific needs.
Global Agent Network: Actively seeking agents and distributors worldwide based on win-win business relationships.
Buy-Back System Support: Provides buy-back systems for selected medium and large-scale projects.
SGS Standard Compliance: Meets international SGS standards for quality assurance and reliability.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
Stable Reliable H20 Formwork Support System for Concrete Construction
US$12.66-13.93
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Yellow H20 Timber Beams Wooden Construction Materials for Concrete Formwork
US$12.66-13.93
100 Pieces(MOQ)
High-Strength Reusable H20 Timber I-Joist for Concrete Formwork and Construction Support
US$8.56-10.56
100 Pieces(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Innovative H20 Concrete Formwork System for Efficient Construction
US$12.66-13.93
100 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Tecon Reusable Steel Frame Formwork for Concrete for Walls/Slab/Columns
US$85.00-140.00
300 Square Meters(MOQ)
Heavy Duty Construction Aluminium Steel Concrete Formwork
US$86.00-198.00
250 Square Meters(MOQ)
Tecon Competitive Price Steel Frame Modular Column Wall Formwork
US$85.00-140.00
300 Square Meters(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
Reliable Slab Formwork Ceiling Formwork Kits for Modern Construction
US$100.00
2,000 Pieces(MOQ)
Factory Direct Sale Kumkang Aluminium Metal Formwork for Concrete System
US$86.00-198.00
250 Square Meters(MOQ)
Tecon Modular Concrete Slab Formwork for Construction
US$50.00-150.00
300 Square Meters(MOQ)
Aluminium Building Formwork Extrusion Profile for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Steel Frame Panel Formwork with Hdo Plywood
US$85.00-140.00
300 Square Meters(MOQ)



















