SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Metal Ringlock Scaffolding for Building Construction Hot DIP Galvanized Shoring Bridge Scaffold Tower System
US$800.00-1,600.00
20 Tons
Sample price:US$1000.00/ton.Request sample

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Warranty

1 Year

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

Internal Scaffolding

Move Method

Integral Lifting Scaffolding

Scaffolding Part Type

Scaffolding Props

Construction Properties

Building Scaffold

Main Components

Standard*, Ledger, Diagonal, U Head Jack

Max Height

24 M

Assembly Efficiency

60 Cbm/Day/Person

Load Quantity

Paint, Powder Coated, Electro Galvanization, Hot D

Application

Slab & Beam Support at Big Height and Heavy Load

Transport Package

Steel Pallet or Nude Cargo

Specification

SGS

Trademark

TECON

Origin

China

HS Code

7308400000

Production Capacity

300 Ton/Month

Key features

High-Strength Material: Constructed from Q355 steel for superior durability and load capacity.
Corrosion Protection: Hot-dip galvanizing treatment extends product lifespan in harsh environments.
Global Safety Certification: Certified by SGS and CE for international compliance and safety standards.
Rapid Assembly System: Designed for quick erection and dismantling using rigid wedge connections.
On-Site Supervision: Comprehensive on-site supervision service available for most global projects.
Buy-Back System: Buy-back option available for medium and large-scale projects to reduce risk.
High Production Capacity: Monthly production capacity of 300 tons ensures timely fulfillment.
Versatile Application: Suitable for slab and beam support at significant heights and heavy loads.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like