Powered by Made-in-China.com
Tecon Pull Push Prop Single Side Bracket Shoring Formwork for Concrete Construction
US$800.00-1,200.00
40 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionPermitted Fresh Concrete Pressure
CustomizedModel NO.
TECON Single Side FormworkApplication
Metro StationMaterial
Steel Q235Product Name
Singleside FormworkColor
CustomizedSurface
PaintedTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
5000set/ YearKey features
No Tie Rod Required: Transfers concrete pressure to support frame without pulling tie rods through the wall.
High Casting Capacity: Supports up to 8 meters concrete casting height in a single pour operation.
Customizable Options: Color and supporting frame heights are fully customized to project needs.
Easy Mobility: Equipped with cast wheels for easy movement by workforce on site.
Wide Compatibility: Compatible with TECON Base 20, Alumni Frame, HETO frame, and G.I. pipes.
On-Site Supervision: Suppliers provide shop drawings, manuals, and on-site training supervision.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Is the product customizable?
A:
Yes, the color and supporting frame heights are customized according to specific requirements.
Q:What is the maximum casting height?
A:
The system supports up to 8 meters of concrete casting height in a single cast.
Q:Does the formwork require tie rods?
A:
No, it transfers fresh concrete pressure to the support frame and foundations without any tie rod being pulled through the wall.
Q:How is the product transported?
A:
It can be moved by workforce using its cast wheels and is easy to transport on or off the project site.
Q:What after-sales services are provided?
A:
Services include on-site supervision, technical planning, shop drawings, user manuals, and training.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Yellow H20 Timber Beams Wooden Construction Materials for Concrete Formwork
US$12.66-13.93
100 Pieces(MOQ)
H20 Timber Beams Brackets Used as Support & Formwork for Construction Materials
US$5.94-6.84
1,000 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
H20 Timber Beam with I-Joist Structure for Building Formwork and Concrete Support
US$8.56-10.56
100 Pieces(MOQ)
High-Strength H20 Timber I-Joist for Concrete Formwork Solutions
US$8.56-10.56
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Tecon Timber Beam Single Side Wall Formwork for Concrete Pouring Construction
US$800.00-1,200.00
40 Sets(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Tecon Single-Side Pull Push Prop Pipe Support for Concrete Wall Formwork
US$800.00-1,200.00
40 Sets(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
Lianggong Single-Side Bracket Formwork Used in Basement Construction
US$180.00-420.00
1 Set(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
Tecon Single Side Bracket Formwork System for Retaining Wall
US$800.00-1,200.00
40 Sets(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Affordable Plastic Formwork Solutions for Concrete Construction Projects
US$20.00-55.00
200 PCS(MOQ)
Premium Meva Formwork Systems Concrete Formwork for Shandong Projects
US$100.00
2,000 Pieces(MOQ)
High-Quality 1220X2440mm Concrete Step Formwork for Global Distribution
US$20.00-55.00
200 PCS(MOQ)
Advanced Concrete Formwork Solutions Meva Formwork for Modern Design
US$100.00
2,000 Pieces(MOQ)



















