Powered by Made-in-China.com

Tecon Rapid Cycle Aluminum Concrete Slab Formwork for Commercial Construction
US$100.00-160.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionWarranty
1 YearSystem Type
Aluminum Beam Slab FormworkMaterial
6005-T6 Aluminum AlloyMain Beam Sizes
1.8, 1.5, 1.2, 0.9 MFlex Beam Sizes
1.5, 1.32, 1.2, 0.9, 0.75, 0.6 MMax Panel Size
1.8*1.5 MMax Permissible Slab Thickness
500 mmStandard Shoring
Medium/ Class D Heavy Duty PropFormlining
18 mm Tecon-Form Birch PlywoodHandling Method
ManualInstallation Time
100-150 Sqm/Person/DayEarly Dismantle System
YesLoad Quantity
450 Sqm/40hq Container (with Shoring Props)Transport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
761090Production Capacity
500000sqm/ YearKey features
Early Stripping System: YES, enables faster project turnover and improved efficiency.
High-Strength Material: Constructed with 6005-T6 Aluminum Alloy for durability.
On-Site Supervision: Available for most projects worldwide excluding restricted regions.
Flexible Beam Sizes: Available in 1.5, 1.32, 1.2, 0.9, 0.75, and 0.6 m options.
High Load Capacity: Supports up to 450 sqm per 40HQ container with shoring props.
Customized Packing: Packed by pallet or customized according to client requirements.
SGS Standard Certified: Meets international safety and quality standards.
High Installation Efficiency: Installation rate of 100-150 sqm per person per day.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Strength Reusable H20 Timber I-Joist for Concrete Formwork and Construction Support
US$8.56-10.56
100 Pieces(MOQ)
Yellow H20 Timber Beams Wooden Construction Materials for Concrete Formwork
US$12.66-13.93
100 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
Yellow Waterproof H20 Timber Beams for Concrete Formwork Construction
US$12.66-13.93
100 Pieces(MOQ)
Innovative H20 Concrete Formwork System for Efficient Construction
US$12.66-13.93
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Reliable Slab Formwork Tecon Formwork Quick Release Formwork for Conrete Construction
US$100.00-160.00
300 Square Meters(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Tecon Table Formwork for Slab Concrete Construction
US$70.00-110.00
300 Square Meters(MOQ)
Building Aluminium Formwork for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Reliable Slab Formwork Ceiling Formwork Kits for Modern Construction
US$100.00
2,000 Pieces(MOQ)
Aluminum Building Formwork Extrusion Profile for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Modular Concrete Slab Formwork for Construction
US$50.00-150.00
300 Square Meters(MOQ)
Tecon Aluflex Aluminium Formwork for Slab and Beam Concrete Construction
US$100.00-160.00
300 Square Meters(MOQ)
Aluminum Construction Formwork for Concrete Building
US$2,200.00-2,800.00
1 Ton(MOQ)



















