SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Slab Beam Formwork for Concrete Casting
US$50.00-150.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Material

Wood and Steel

Model NO.

flex 20

Usage

for Slab and Decking

Type

Slab Formwork

Size

Customized

Permitted Fresh Concrete Pressure

Customized

Plywood Thickness

18/21mm

The Biggest Table Size

4*6m

Biggest Advantage

Easy to Assemble

Certificate

CE

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

High Flexibility Design: Optimized for multiple beams, drop beams, and narrow spaces with free component connection.
Customized Solutions: Tailored for slab thickness up to 100cm, storey height, and specific client requirements.
Easy Assembly System: Features Beam 20 Bracket and Extension with an easy tighten system using D15 rod & nut.
High Load Capacity: Equipped with TEP-B, TEP-D, and TEP-E heavy-duty props for high workload-bearing capacity.
Professional On-Site Support: Includes shop drawings, user manuals, and supervisor training for on-site supervision.
CE Certified Quality: Products pass finished inspection with QC profiles and CE certification for quality assurance.
Fast Delivery Options: Off-season lead time within 15 workdays; peak season lead time is one month.
One-Stop Service: Comprehensive support from budgeting and technical planning to delivery and completion.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:What is the maximum slab thickness supported?
A:
The formwork supports different slab thicknesses up to 100cm.
Q:Is the size customizable?
A:
Yes, the size is customized according to client requirements and project needs.
Q:What materials are used in the formwork?
A:
The main components include H20 timber beams, shoring props, and TECON-Form plywood (18mm or 21mm).
Q:What after-sales services are provided?
A:
We provide on-site supervision, including shop drawings, user manuals, and supervisor training.
Q:What is the lead time for delivery?
A:
Off-season lead time is within 15 workdays, while peak season lead time is one month.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tecon Table Formwork for Slab Concrete Construction

Tecon Table Formwork for Slab Concrete Construction

US$70.00-110.00
300 Square Meters(MOQ)
Made-in-China.com
Flexible Timber Beam Slab Formwork System for Concrete Floors
Made-in-China.com
Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Wooden Slab Formwork System for Building Materials
Made-in-China.com
Tecon Modular Concrete Slab Formwork for Construction

Tecon Modular Concrete Slab Formwork for Construction

US$50.00-150.00
300 Square Meters(MOQ)
Made-in-China.com