Powered by Made-in-China.com
Tecon Steel Wood Q235 Building Material Automatic Self Climbing Formwork
US$3,000.00-5,000.00
2 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionHigh Carring Capacity
80kn Per CylinderModel NO.
TECON Self-climbing FormworkSpeed
0.5 Hours Per ClimbingHight
4.5m, 5m, >5mProduct Name
Hydraulic Self-Climbing Steel Formwork for ConstruFeature
Steady&High-Safety Progress During Self-ClimbingTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
50000sets/ YearKey features
Automatic Self-Climbing: Climbs automatically without the need for a crane lift, ensuring high efficiency.
High Safety System: Features double embedding anchor system and climbing shoe for trustful safety.
High Carrying Capacity: Supports up to 80kN per cylinder for heavy-duty operation layers.
Fast Climbing Speed: Achieves climbing speed of around 0.5 hours per floor.
High Reutilization Rate: Offers up to 90% reutilization rate across different projects.
Customized Planning: Adapts to different geometry plans and floor heights via customized planning.
Sealed Protection: Fully sealed outer protection minimizes weather effects on construction.
On-Site Supervision: Includes shop drawings, user manuals, and supervisor training at the site.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Does the formwork require a crane for climbing?
A:
No, the self-climbing platform can climb automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed is around 0.5 hours per floor.
Q:Can the system be customized for different project geometries?
A:
Yes, it adapts to different geometry plans and floor heights via customized planning.
Q:What is the maximum carrying capacity?
A:
The carrying capacity is up to 80kN per cylinder.
Q:What is the reutilization rate of this formwork?
A:
The reutilization rate is up to 90% from different projects.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Yellow H20 Timber Beams Wooden Construction Materials for Concrete Formwork
US$12.66-13.93
100 Pieces(MOQ)
H20 Timber Beams Brackets Used as Support & Formwork for Construction Materials
US$5.94-6.84
1,000 Pieces(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$80.00
30 Square Meters(MOQ)
H20 Timber Beams Brackets Used as Support & Formwork for Construction Materials
US$5.94-6.84
1,000 Pieces(MOQ)
Reusable High Quality H20 Timber Beams Durable Construction Formwork Materials
US$12.66-13.93
100 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Heavy Duty Construction Aluminium Steel Concrete Formwork
US$86.00-198.00
250 Square Meters(MOQ)
Lightweight Plastic Construction Formwork From Factory for Building Projects
US$20.00-55.00
200 PCS(MOQ)
Tecon Self Climbing System Automatic Self Climbing Formwork
US$3,000.00-5,000.00
2 Sets(MOQ)
Extruding Aluminium Profiles of High Rise Building Formwork System
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Automatic Hydraulic Self Climbing Formwork
US$3,000.00-5,000.00
2 Sets(MOQ)
China Aluminium Extrusion Manufacturer-Concrete Building Aluminum Formwork Extruding Profile
US$2,200.00-2,800.00
1 Ton(MOQ)
High-Quality Slab Formwork Systems for Residential Building Needs
US$65.00
250 Square Meters(MOQ)
Plastic Formwork Scaffolding System for PVC Building Solutions
US$1,120.00-1,800.00
10 Tons(MOQ)



















