Powered by Made-in-China.com
Tecon Table Formwork for Large Floor Slab Concrete Casting
US$70.00-110.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionWarranty
1 YearModel NO.
TECON Slab Table FormworkSystem Type
Timber Slab FormworkMaterials
Imported Spruce Wood, H20 Timber BeamStandard Shoring
Class D/E Heavy Duty Prop (En 1065)Max Unit Size
4×6 MMax Permissible Slab Thickness
1000 mmInstallation Time
200 Sqm/Day/Unit (5 People)Formlining
18/21 mm Plywood, Plastic Board, PP BoardHandling Method
Trolley/Tower CraneLoad Quantity
Around 300 Sqm/40 Hq ContainerTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
730840Production Capacity
500000sqm/ YearKey features
Customized Concrete Pressure: Permitted fresh concrete pressure can be customized to meet specific project requirements.
Customized Packing Options: Packing available by standard pallet or customized according to customer needs.
On-Site Supervision Service: Professional on-site supervision provided for most global projects excluding restricted regions.
1-Year Warranty Coverage: Comprehensive 1-year warranty included for all mechanical equipment and formwork systems.
Large Slab Project Capability: Designed specifically for large area slab projects with max thickness up to 450mm.
Flexible Transportation Methods: Transportation supported via trolley or crane for efficient site handling.
High Load Capacity: Max size reaches 4x6 meters with weight of 43.86kg per square meter.
SGS Standard Compliance: Products manufactured and tested according to strict SGS international standards.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤24hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
H20 I-Joist Timber Beam with High-Strength Design for Wall Slab and Formwork
US$8.56-10.56
100 Pieces(MOQ)
Stable Reliable H20 Formwork Support System for Concrete Construction
US$12.66-13.93
100 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
High-Strength H20 Timber I-Joist for Concrete Formwork Solutions
US$8.56-10.56
100 Pieces(MOQ)
Innovative H20 Concrete Formwork System for Efficient Construction
US$12.66-13.93
100 Pieces(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Tecon Table Formwork for Slab Concrete Construction
US$70.00-110.00
300 Square Meters(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Tecon Highly Efficient Slab Table Formwork System for Civil Architecture
US$70.00-110.00
300 Square Meters(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Shandong Concrete Formwork Solutions Slab Formwork for Apartment Use
US$100.00
2,000 Pieces(MOQ)
China PVC Plastic Formwork Panel Reusable Waterproof Lightweight for Concrete Slab Construction
US$1,150.00-1,170.00
10 Tons(MOQ)
Tecon Table Formwork for Large Area Slab Concrete Construction
US$70.00-110.00
300 Square Meters(MOQ)
Plastic Concrete Forms PVC Slab Formwork Shuttering of Scaffolding System
US$1,120.00-1,800.00
10 Tons(MOQ)
Tecon Table Form Aluminium Formwork for Beam-Less Concrete Structure Projects
US$100.00-160.00
300 Square Meters(MOQ)
Aluminum Formwork Fabrication for High-Rise Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Versatile Slab Formwork Systems Concrete Formwork for Heavy Duty Use
US$100.00
2,000 Pieces(MOQ)



















