SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Table Slab Formwork for Construction
US$70.00-110.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Material

Wood and Steel

Model NO.

TECON slab table formwork

Permitted Fresh Concrete Pressure

Customized

Standard Size

with Lengths of 4.00 M or 5.00 M and Widths of 2.0

Height

Can Be up to 5.0m

Usage

for Large Area Slab Porject

Transportation

by Trolley or Crane

Max Size

4 * 6 Meters

Max Slab Thickness

450 mm

Weight

43.86kg/Sqm

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Pre-assembled Efficiency: Ready-to-use tables combined with H20 beams and props for quick crane lift moves.
Customizable Dimensions: Fresh concrete pressure and height are customized; standard sizes include 4m/5m lengths.
Large Area Coverage: Big shuttering area tables significantly increase site efficiency for large projects.
High Load Capacity: Supports slab thicknesses up to 50 cm and storey heights up to 5.5 m.
Versatile Transportation: Horizontal movement via trolley and vertical lifting via crane with lifting fork.
Comprehensive Support: Includes on-site supervision, technical planning, and shop drawing services.
Quality Assurance: Certification of Quality issued with QC profiles; pre-shipment inspection supported.
Wide Application: Suitable for residential, commercial, bridges, dams, and civil engineering projects.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:What is the maximum slab thickness supported?
A:
The formwork supports slab thicknesses up to 50 cm. For bigger thicknesses, additional support is required.
Q:Can the formwork size be customized?
A:
Yes, the permitted fresh concrete pressure is customized. Standard sizes include lengths of 4.00 M or 5.00 M and widths of 2.0 M.
Q:How is the formwork transported between floors?
A:
It can be quickly moved by a single crane lift due to pre-assembled tables. Horizontal transportation is done by trolley.
Q:What after-sales services are provided?
A:
Services include on-site supervision, technical planning, shop drawings, user manuals, and training.
Q:What is the lead time for delivery?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tecon Modular Concrete Slab Formwork for Construction

Tecon Modular Concrete Slab Formwork for Construction

US$50.00-150.00
300 Square Meters(MOQ)
Made-in-China.com
Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Table Formwork for Slab Concrete Construction

Tecon Table Formwork for Slab Concrete Construction

US$70.00-110.00
300 Square Meters(MOQ)
Made-in-China.com