Powered by Made-in-China.com
Tecon The Automatic Hydraulic Jump, Self - Climbing Formwork
US$3,000.00-5,000.00
2 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionHigh Carring Capacity
80kn Per CylinderModel NO.
TECON Self-climbing FormworkSpeed
0.5 Hours Per ClimbingHight
4.5m, 5m, >5mProduct Name
Hydraulic Self-Climbing Steel Formwork for ConstruFeature
Steady&High-Safety Progress During Self-ClimbingTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
50000sets/ YearKey features
Automatic Self-Climbing: Climbs automatically without requiring a crane lift for operation.
High Safety System: Features double embedding anchor system and climbing shoe for trustful safety.
High Efficiency: Climbing speed is around 0.5 hours per floor with reutilization rate up to 90%.
Customized Planning: Adapts to different geometry plans and floor heights via customized planning.
Sealed Protection: Fully sealed climbing platform with negligible weather effect.
High Carrying Capacity: Supports 80kN per cylinder with simultaneous operation of 2 or 3 steps.
On-Site Supervision: Includes shop drawings, user manuals, and supervisor training at your site.
Comprehensive Service: Offers consultancy, technical planning, and pre-shipment inspection support.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Does the formwork require a crane to climb?
A:
No, the self-climbing platform can climb automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed is around 0.5 hours per floor.
Q:Can the system be customized for different project geometries?
A:
Yes, it adapts to different geometry plans and floor heights via customized planning.
Q:What is the carrying capacity of the operation layer?
A:
It supports simultaneous operation of 2 steps at 3 kN per cubic meter or 3 steps at 2 kN per cubic meter.
Q:What safety features does the system include?
A:
It features a double embedding anchor system and climbing shoe for trustful safety.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
H20 Timber Beam with I-Joist Structure for Building Formwork and Concrete Support
US$8.56-10.56
100 Pieces(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
High-Strength Reusable H20 Timber I-Joist for Concrete Formwork and Construction Support
US$8.56-10.56
100 Pieces(MOQ)
High-Strength H20 Timber Joist with I-Beam Profile for Building Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Manufacturer-Direct H20 Timber I-Joist with Waterproof WBP Glue for Building Formwork
US$8.56-10.56
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
Tecon High Efficiency Automatic Self Climbing Formwork for Central Shaft Core Wall
US$3,000.00-5,000.00
2 Sets(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Tecon Automatic Hydraulic Self Climbing Formwork for High Rise Building
US$3,000.00-5,000.00
2 Sets(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
Advanced Concrete Formwork Solutions Meva Formwork for Modern Design
US$100.00
2,000 Pieces(MOQ)
Premium Custom 6063 CNC Aluminum Formwork Solutions for Construction
US$10.00-15.00
10 Pieces(MOQ)
Tecon Automatic Hydraulic Self-Climbing Formwork for Core Wall
US$3,000.00-5,000.00
2 Sets(MOQ)
Premium 6063 CNC Aluminum Formwork with CE Certification for Construction
US$10.00-15.00
10 Pieces(MOQ)
Tecon High Efficiency Automatic Self Climbing Formwork for Concrete Construction
US$3,000.00-5,000.00
2 Sets(MOQ)
Logicwall Permanent Formwork System for PVC Walling Solutions
US$1,120.00-1,800.00
10 Tons(MOQ)
Reliable Ceiling Formwork Solutions Slab Formwork for Shandong Apartments
US$100.00
2,000 Pieces(MOQ)



















