SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Timber Beam Formwork for Slab and Beam Construction
US$50.00-150.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Warranty

1 Year

Model NO.

flex 20

System Type

Timber Slab Formwork

Material

Imported Spruce Wood, H20 Timber Beam

Standard Shoring

Class D/E Heavy Duty Prop (En 1065)

Size and Shape

Customized

Max Permissible Slab Thickness

1000 mm

Formlining

18/21 mm Plywood; Plastic Board; PP Board

Early Dismantle System

Optional

Handling Method

Manual/Tower Crane

Load Quantity

Around 350 Sqm/40 Hq Container

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Customized Size: Size is fully customizable to meet specific project requirements.
Customized Pressure Rating: Permitted fresh concrete pressure is customized for different applications.
CE Certification: Product holds CE certificate ensuring compliance with safety standards.
Easy Assembly: Designed for easy assembly to improve construction efficiency.
On-Site Supervision: Professional on-site supervision service available for most global projects.
1-Year Warranty: Comes with a 1-year warranty covering mechanical defects.
Stock Availability: 5000 sqm plastic formwork and other systems available in stock for quick shipping.
Buy-Back System: Buy-back system offered for medium and big scale projects.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Modular Concrete Slab Formwork for Construction

Tecon Modular Concrete Slab Formwork for Construction

US$50.00-150.00
300 Square Meters(MOQ)
Made-in-China.com
Aluminium Profile-Al Panel Wall and Alu Slab-Alm Formwork
Made-in-China.com