Powered by Made-in-China.com
Tecon Timber Beam Formwork for Slab and Beam Construction
US$50.00-150.00300 Square Meters
Tecon Timber Beam Formwork for Slab and Beam Construction
US$50.00-150.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionWarranty
1 YearModel NO.
flex 20System Type
Timber Slab FormworkMaterial
Imported Spruce Wood, H20 Timber BeamStandard Shoring
Class D/E Heavy Duty Prop (En 1065)Size and Shape
CustomizedMax Permissible Slab Thickness
1000 mmFormlining
18/21 mm Plywood; Plastic Board; PP BoardEarly Dismantle System
OptionalHandling Method
Manual/Tower CraneLoad Quantity
Around 350 Sqm/40 Hq ContainerTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
730840Production Capacity
500000sqm/ YearKey features
Customized Size: Size is fully customizable to meet specific project requirements.
Customized Pressure Rating: Permitted fresh concrete pressure is customized for different applications.
CE Certification: Product holds CE certificate ensuring compliance with safety standards.
Easy Assembly: Designed for easy assembly to improve construction efficiency.
On-Site Supervision: Professional on-site supervision service available for most global projects.
1-Year Warranty: Comes with a 1-year warranty covering mechanical defects.
Stock Availability: 5000 sqm plastic formwork and other systems available in stock for quick shipping.
Buy-Back System: Buy-back system offered for medium and big scale projects.
Company profile

Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
High-Quality Yellow H20 Timber I-Joist with Reinforced Flanges for Building Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
Premium H20 Timber I-Joist with High-Strength Flanges for Building and Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
High Strength Waterproof Yellow H20 Beam Formwork for Construction
US$12.66-13.93
100 Pieces(MOQ)
Cost Effective H20 Adjustable Scaffold Frame for Formwork Construction
US$12.66-13.93
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Flexible Timber Beam Slab Formwork System for Concrete Floors
US$50.00-150.00
300 Square Meters(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Tecon Wooden Slab Formwork System for Building Materials
US$50.00-150.00
300 Square Meters(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
High Density PP Hollow Formwork for Slab Construction with CE
US$18.00-22.00
100 Pieces(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
Reliable Slab Formwork Tecon Formwork Quick Release Formwork for Conrete Construction
US$100.00-160.00
300 Square Meters(MOQ)
Versatile Durable Plastic Formwork for Slab and Foundation Projects
US$20.00-55.00
200 PCS(MOQ)
Tecon Modular Concrete Slab Formwork for Construction
US$50.00-150.00
300 Square Meters(MOQ)
China PVC Plastic Formwork Panel Reusable Waterproof Lightweight for Concrete Slab Construction
US$1,150.00-1,170.00
10 Tons(MOQ)
Durable Slab Formwork with Online Technical Support for Apartment Construction
US$65.00
250 Square Meters(MOQ)
Premium Durable Plastic Formwork for Concrete Columns and Beams
US$20.00-55.00
200 PCS(MOQ)



















