SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Walk Through Mason Scaffolding H Frame
US$215.00
1 Set

Product profile

Customization

Available

After-sales Service

on- Site Supervision

System Type

Shoring System

Model NO.

TST60 Shoring Tower

Material

Q355 Steel Profile

Diameter

60×3 mm

Standard Frame Size

1.5×1.5/1.2/1.0 M; 1.2×1.2/1.0 M

Max Support Height

30 M

Load Capacity

60 kN/Leg (up to 13 M)

Installation Time

180 M³/Person/Day

Handling Method

Trolley/Tower Crane

Load Quantity

Around 13 T Per 40 Hq Container

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

High Load Capacity: Supports up to 60 kN per leg with a 2.5x safety factor.
Durable Material: Q355 steel profile with hot-dip galvanized surface for 8+ years service.
Adjustable Height: Screw jacks allow 500mm extension at each end for precise leveling.
Versatile Application: Ideal for bridges, subways, buildings, and heavy load civil projects.
Professional Support: Includes on-site supervision, training, and technical planning services.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:What is the maximum load capacity?
A:
The scaffolding supports up to 60 kN per leg, even with a 2.5 times safety factor considered.
Q:How long does installation take?
A:
Installation speed is approximately 180 cubic meters per person per day due to its fast and user-friendly design.
Q:What material is used for the frame?
A:
The mainframe is made of Q355 steel profile with a hot-dip galvanized surface treatment for durability.
Q:Is on-site supervision included?
A:
Yes, we offer on-site supervision, including sending supervisors for training and supervision upon request.
Q:What are the standard frame sizes?
A:
Standard sizes include 1.5x1.5m, 1.5x1.2m, 1.5x1.0m, 1.2x1.2m, 1.2x1.0m, and variations like 1.2x1.1m to 1.5x1.6m.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Trianglar Steel Chamfer (steel chamfer)

Trianglar Steel Chamfer (steel chamfer)

US$750.00-850.00
20 Tons(MOQ)
Made-in-China.com
Tecon Competitive Price Steel Frame Modular Column Wall Formwork
Made-in-China.com
Precast Concrete Shuttering with Magnets

Precast Concrete Shuttering with Magnets

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com