SourcingAI
Try for free
Powered by Made-in-China.com
1250kVA Dry Type Transformer with Epoxy Resin, 0 4kv/11kv Output
US$369.00-1,788.00
1 Piece

Product profile

Customization

Available

Application

Power, High-Rise Buildings, Factory, Hydropower Station

Phase

Three

Model NO.

SCB18

Core

Core-type Transformer

Cooling Method

Dry-type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001, CCC, ISO9001-4000,CE

Usage

Power Transformer, Distribution Transformer, Three Phase Transformer

Frequency Characteristics

Power Frequency

Shape of Core

Ring

Brand

Tenrony

Rated Capacity

1250kVA

Primary Voltage

11kv/33kv

Secondary Voltage

0.4kv/11kv

Cooling

an/Af

Insulation Tempareture Resistance Grade

Grade F or Above

Joni Group Label

Dyn11 Yyn0

Core Material

Silicon Steel

Winding

Copper/Aluminum

Transport Package

Wooden Case

Trademark

Tenrony

Origin

China

HS Code

8504329000

Production Capacity

500 Sets Per Month

Key features

Epoxy Resin Insulation: Provides excellent moisture-proof and anti-fouling performance with high reliability.
Intelligent Temperature Control: Features BWDK series sensors with over-temperature alarm and trip functions.
Advanced Manufacturing: Utilizes foreign technology with standardized management and complete testing means.
High Reliability: Operation reliability reaches international advanced levels verified by market users.
Customization Options: Offers full customization, minor customization, and customization from samples or designs.
Wide Application Scenarios: Suitable for high-rise buildings, hospitals, data centers, and dusty or moist environments.
Strict Quality Inspection: 100% visual and function inspection for all finished products before delivery.
OEM/ODM Services: Manufacturer supports OEM and ODM services with 7 R&D engineers.

Company profile

Zhejiang Tianrun Electric Co., Ltd.
Importers and ExportersFull Customization100% Finished Products InspectionR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.90h

About Our Factory & Business Background

AddressNo. 788 Wenyi Road, Bihu Industrial Park, Liandu District, Lishui, Zhejiang, China
Plant Area50369.12 square meters
Number of Employees167
Registered Capital107,580,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners80

Our Production Capability & Technical Expertise

Main ProductsTransformer Switchgear Substation
Production Lines2
Production MachinesPunching machine, Laser cutting machine, CNC bending machine, Winding machine, Drying machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers7 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2003-12-05
Main MarketsDomestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff1
Overseas Agent/BranchYes
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:What is the maximum installation altitude?
A:
The transformer is designed for installation altitudes not exceeding 1000 meters.
Q:Can the transformer be customized?
A:
Yes, we offer full customization, minor customization, and options based on samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 unit.
Q:What certifications does the product have?
A:
The product holds ISO9001, CCC, CE, ISO14001, and ISO45001:2018 certifications.
Q:What is the lead time for production?
A:
Lead time is within 15 workdays during off-peak season and one month during peak season.

Send Inquiry

*To:Zhejiang Tianrun Electric Co., Ltd.Zhejiang Tianrun Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

250kVA 11kv 0.4kv Insulation Dry Type Transformer
Made-in-China.com
Heyi Sc (B) 11 Type Epoxy Cast Resin Dry Type Transformer
Made-in-China.com