Powered by Made-in-China.com
Durable Liquid Filled Three Phase Step Down Distribution Step Uptransformer Pad Mounted Substation
US$3,000.00-5,000.00
1 Piece
Product profile
Customization
AvailableApplication
Power, High-Rise Buildings, Factory, Hydropower StationPhase
ThreeModel NO.
ZGS-12Core
Core-type TransformerCooling Method
Oil-immersed Type TransformerWinding Type
Two-winding TransformerCertification
ISO9001, CCC, ISO9001-4000,CE,ULUsage
Combined Transformer, Power Transformer, Distribution Transformer, Pad-Mounted TransformerFrequency Characteristics
Power FrequencyShape of Core
RingBrand
TenronyCooling
Onan/KnanRated Capacity
75-2500kVAWinding Material
Copper/AluminumWarranty
24 MonthsTransport Package
Wooden CaseSpecification
CustomizedTrademark
Tenrony ElectricOrigin
ChinaHS Code
8537209000Key features
Compact Space Saving: Small footprint, only 1/3-1/5 space of same-capacity domestic European box transformers.
Full Sealed Design: Totally sealed and insulated design, no extra insulation space needed, safe for operation.
Superior Performance: Low loss, low noise, low temperature rise; strong overload, short-circuit and impact resistance.
Flexible HV Wiring: Suitable for ring network and terminal power supply, stable and flexible in use.
Customizable Options: Customizable cooling, rated capacity, winding material, and warranty period.
Diversified Terminals: Equipped with 200A elbow plug and 600A T-type cable connectors, match insulated surge arresters.
Real-time Monitoring: Fitted with oil temperature, level, pressure gauges, relief valve and drain valve.
Various Power Modes: Available in ring network, terminal and dual power supply modes for diverse scenarios.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.85h
About Our Factory & Business Background
AddressNo. 788 Wenyi Road, Bihu Industrial Park, Liandu District, Lishui, Zhejiang, China
Plant Area50369.12 square meters
Number of Employees167
Registered Capital107,580,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners80
Our Production Capability & Technical Expertise
Main ProductsTransformer Switchgear Substation
Production Lines2
Production MachinesPunching machine, Laser cutting machine, CNC bending machine, Winding machine, Drying machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers7 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2003-12-05
Main MarketsDomestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff1
Overseas Agent/BranchYes
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Product CertificationCE
Cooperated with Fortune 500No
Product Q&A
Q:What are the customizable options for this transformer?
A:
We offer customization for cooling (Onan/Knan), rated capacity (75-2500kVA), winding material (Copper/Aluminum), and warranty (24 Months).
Q:What is the warranty period for the product?
A:
The standard warranty period is 24 months.
Q:What certifications does the transformer have?
A:
The product holds ISO9001, CCC, ISO9001-4000, CE, and UL certifications.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 unit.
Q:What are the payment terms?
A:
The terms of payment are T/T (Telegraphic Transfer).
Send Inquiry
*To:
Zhejiang Tenrony Electric Co, . Ltd
Zhejiang Tenrony Electric Co, . Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Three Phase Pad Mounted Distribution Transformer American Box Substation
US$1,500.00-3,000.00
1 Piece(MOQ)
35kv 50kVA 250 kVA 100 kVA High Voltage Step Down Three Phase Compact Transformer Substation
US$1,000.00-70,000.00
1 Piece(MOQ)
35kv 10kv Three Phase Pad Mounted Distribution Transformer American Box Substation
US$1,500.00-3,000.00
1 Piece(MOQ)
Zgs11 125kVA 12kv 400V Three Phase Electrical Pad-Mounted Transformer Box Type Substation Distribution Transformer Substation
US$1,900.00-2,100.00
1 Piece(MOQ)
Zgs11 500kVA 11kv 0.4kv Step-Down Pad Mounted Oil Transformer Box-Type Substation
US$8,500.00-20,000.00
1 Piece(MOQ)
Three Phase Pad Mounted Transformer Substation for Step Down Power
US$10,000.00-15,000.00
1 Piece(MOQ)
ZGS11 1600 KVA 11 / 0.4 KV Step-Down Box-Type Pad Mounted Oil Transformer Substation
US$22,495.00-22,795.00
1 Piece(MOQ)
OEM Power Distribution Pad Mounted Transformer Three-Phase Compact American Box Type Substation
US$1,500.00-3,000.00
1 Piece(MOQ)
50~1250kVA Three Phase Step up and down Prefabricated Compact Transformer Substation
US$1,000.00-200,000.00
1 Piece(MOQ)
Three-Phase Pad-Mounted Transformer Professional Electrical Power Compact Substation Box Type Transformer
US$2,687.00-2,989.00
1 Piece(MOQ)
Power Supply Modular Power Distribution Cabinet Pad Mounted Prefabricated Isolation Step up Electrical Transformer Substation
US$5,000.00-10,000.00
1 Piece(MOQ)
33kv 600kVA Three Phase Power Distribution Substation
US$20,000.00
1 Piece(MOQ)
Durable Box-Type Step-Down Substation for Efficient Campus Power
US$10,000.00-50,000.00
1 Set(MOQ)



















