Powered by Made-in-China.com
Fgd Series Flue Gas Desulfurization Centrifugal Pump
US$4,000.00-20,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
Video Instruction, Supply AccessoriesWarranty
2 YearsModel NO.
FGDMax.Head
6~65mMax.Capacity
>400 L/minDriving Type
MotorImpeller Number
Single-Stage PumpWorking Pressure
Middle Pressure PumpInfluent Type of Impeller
Single Suction PumpPosition of Pump Shaft
Horizontal PumpPump Casing Combined
Horizontal Split PumpsMounting Height
Suction CentrifugalImpeller
OpenUsage
Pump, Pumps, Slurry Pump, Flue Gar Desulfurization PumpOperating Temperature
-40~175 Degree CentigradePerformance Parameters
ISO2858Technical Requirments
ISO5199Structure
Centrifugal PumpApplication
Flue Gas Desulfurization, SlurryProduct Capacity
10000PCS/MonthColor
CutomizedPump Body
Cast IronTransport Package
Ipcs/CTNSpecification
Customer' s requirementTrademark
SAMOrigin
ChinaHS Code
8413701010Production Capacity
10000PCS/MonthKey features
Customized Color: Color is customizable to meet specific project requirements.
ISO Standard Compliance: Technical requirements conform to ISO5199 and wetted parts meet ASTM standards.
Intelligent Monitoring: Compatible with intelligent monitoring systems for automatic control or DCS integration.
Robust Material Construction: Constructed with cast stainless steel and cast titanium for corrosion resistance.
2-Year Warranty: Comprehensive 2-year warranty coverage for peace of mind.
Video Technical Support: After-sales service includes video instruction and supply of accessories.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2024-09-25Nearest Port: Shanghai, Ningbo, GuangzhouAverage Response Time: ≤4.80hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CPT
About Our Factory & Business Background
AddressNo. 567 Dengcai Road, Sandun Town, Westlake District, Hangzhou, Zhejiang, China
Average Lead TimePeak Season Lead Time: 6-12 months Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsChemical Pump, FRP Tank, HCl Graphite Tower
Our Industry Experience & Global Business Record
Main MarketsAfrica, Mid East, Eastern Asia
Product Q&A
Q:What materials are used for the wetted parts?
A:
Wetted parts comply with ASTM standards, commonly using cast stainless steel and cast titanium.
Q:Is the color of the pump customizable?
A:
Yes, the color is customized according to customer requirements.
Q:What is the warranty period?
A:
We provide a 2-year warranty for this product.
Q:What after-sales services are provided?
A:
We offer video instruction and supply accessories as part of our after-sales service.
Q:What standards does the pump comply with?
A:
Technical requirements conform to ISO5199, and wetted parts comply with ASTM standards.
Send Inquiry
*To:
Hangzhou Tianchen Import and Export Co., Ltd.
Hangzhou Tianchen Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Fgd Series Sewage Disposal Centrifugal Pump
US$4,000.00-20,000.00
1 Piece(MOQ)
Fgd Flue Gas Desulfurization Pump/Desulfurization Pump
US$500.00
1 Piece(MOQ)
Flue Gas Desulfurization Fgd Slurry Pump Desulfurization Pump for Power Plant
US$9,000.00
1 Piece(MOQ)
Fgd Titanium Stainless Steel Flue Gas Desulfurization Centrifugal Pump
US$4,000.00-20,000.00
1 Piece(MOQ)
Fgd Series Single Stage and Single Suction Flue Gas Desulfurization Pump
US$4,000.00-12,000.00
1 SET(MOQ)
Corrosion Resisting Flue Gas Desulfurization Fgd Pump
US$600.00
1 Piece(MOQ)
Advanced Fgd Series Single Stage and Single Suction Flue Gas Desulfurization Pump
US$190.00-200.00
2 Pieces(MOQ)
Horizontal Slurry Pump for Flue Gas Desulfurization (FGD) System
US$800.00-50,000.00
1 Piece(MOQ)
Flue Gas Desulfurization Pump/Desulfurization Pump
US$500.00
1 Piece(MOQ)
Centrifugal Dt Fgd Flue Gas Desulphurization Pump
US$500.00
1 Piece(MOQ)
Teikoku Horizontal/Vertical Mud Series Canned Motor Pump for Oil/Liquid Gas
US$2,500.00
1 Piece(MOQ)
Pansto Flue Gas Desulfurization Slurry Pump for Thermal Power Plant
US$8,895.00
1 Piece(MOQ)
Pansto Pump Flue Gas Desulfurization Slurry Pump
US$9,000.00
1 Piece(MOQ)
Circulating Pump for Flue Gas Desulfurization Slurry in Steel Plant
US$520.00-1,000.00
1 Set(MOQ)
API 610 Vs6 Series Fvd Multi-Stage High Pressure Vertical Centrifugal Pumps for Oil and Gas Industry
US$500.00-5,000.00
1 Piece(MOQ)
High-Efficiency Oh2 Series Centrifugal Chemical Process Pumps for Oil & Gas
US$500.00-50,000.00
1 Piece(MOQ)
Bb Series Centrifugal Chemical Pump for Chemical, Oil and Gas Processing Industry
US$1,500.00-50,000.00
1 Set(MOQ)



















