Powered by Made-in-China.com
10t Middle East Desert-Adapted Eaf with Sand Filtration
US$359,020.00-598,800.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
1 YearWarranty
1 YearModel NO.
HD78905Customized
CustomizedCondition
NewPower Source
ElectricAutomatic Grade
AutomaticType
Steel-Making EquipmentCertification
ISO, CE, CCS, LR, ABSApplicable Industries
Energy & MiningMarketing Type
Ordinary ProductDuty Cycle
100% 24h Continuous WorkLoading Capacity
10~3000kg(Adjustable)Heating Rate
85%Transport Package
Special DesignSpecification
CustomizedTrademark
HaodeOrigin
ChinaProduction Capacity
500set/YearKey features
Sand Filtration Adaptation: Specifically designed for Middle East desert environments with integrated sand filtration.
Customizable Capacity: Loading capacity is adjustable from 10kg to 3000kg to meet specific production needs.
High-Quality Refractory Materials: Uses aluminum-magnesium spinel, magnesia-chrome, and high-aluminum precast casting bricks.
Professional Design Team: Designers with 30 years experience and expert review ensure zero construction mistakes.
Continuous Work Capability: Duty cycle supports 100% 24-hour continuous operation for high efficiency.
Comprehensive Certifications: Certified by ISO, CE, CCS, LR, and ABS for international market compliance.
OEM Service Available: We accept OEM orders to customize products according to client specifications.
Strict Quality Inspection: Products undergo strict inspection before shipment to guarantee quality standards.
Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2018-03-22Nearest Port: Tianjin PortAverage Response Time: ≤1.11hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, FAS, DDP
AI-Powered supplier vetting
SummaryThe supplier is identified as a trading company operating in the power, heat, gas, and water supply industry, with business activities covering generator and generator-set sales, electrical equipment repair, technical services, and import/export agency. It reports transformer productivity of 500,000 sets and broad customization options. Management-system certifications include ISO9001:2015, ISO14001, and ISO45001:2018, while CE capability is reported. After-sales procedures for corrective actions and complaint handling are documented, but overseas service infrastructure is limited: no overseas branches, agents, warehouses, showrooms, or stated overseas-service countries. Financial records are indicated for 2021–2023, but the provided information does not include financial results or ratios. Innovation evidence is limited to two R&D engineers, no SDK, and no new products launched last year. No OEM service for popular brands or Fortune 500 cooperation is reported.
CertificationsThe supplier reports ISO9001:2015, ISO14001, and ISO45001:2018 management-system certificates, plus CE product-certification capability. These are explicit certification credentials, although the slices do not provide certificate validity dates or scope details.
R&D capabilityThe supplier reports two R&D engineers and holds CE capability, but has no available SDK and launched no new products in the last year. These explicit limitations outweigh the limited evidence of R&D resources for assessing innovation strength.
Production capacityReported transformer productivity is 500,000 sets, and average lead time is within 15 workdays in both peak and off-season periods. However, the supplier reports no in-stock capability, and the status of a valid manufacturing-capacity contract is unknown; the evidence supports stated capacity but not broad production-resource readiness.
Customization capabilityThe supplier explicitly supports customization from samples, designs, full customization, minor customization, and flexible customization. This is direct evidence of broad customization service capability.
Product Q&A
Q:Can we visit your company?
A:
Sure, welcome at any time, seeing is believing.
Q:Do you accept OEM?
A:
Yes, we can do OEM.
Q:What are the payment terms?
A:
Usually T/T, but L/C, Western Union etc are available for us.
Q:How long is delivery time?
A:
The delivery time will be determined according to the quantity of the order.
Q:How are your products' quality?
A:
The products will be strictly inspected before shipment, so the quality could be guaranteed.
Send Inquiry
*To:
Tianjin Haode Intelligent Electrical Co., Ltd.
Tianjin Haode Intelligent Electrical Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Steelmaking Electric Arc Furnace DC Eaf
US$10,000.00-350,000.00
1 Set(MOQ)
Electric Arc Furnaces / Eaf for Melting Steel and Other Ferrous Metals
US$10,000.00-350,000.00
1 Set(MOQ)
10t Volcanic Ore Smelting Eaf with Lava-Resistant Lining
US$350,020.00-589,800.00
1 Piece(MOQ)
Metallurgical Furnace Electric Arc Furnace Eaf Manufacturer 25tons
US$60,000.00-450,000.00
1 Set(MOQ)
10t Renewable Energy Wind Turbine Parts Smelting Eaf
US$369,020.00-598,800.00
1 Piece(MOQ)
Metal Melting Furnace 50 Ton Electric Arc Furnace Eaf Manufacturers
US$100,000.00-1,000,000.00
1 Set(MOQ)
Metallurgical Toner System Spare Parts Furnace Eaf
US$500.00-20,000.00
1 Piece(MOQ)
High Efficiency Durable Large 50 Ton Electric Arc Furnace Eaf for Melting Furnace
US$10,000.00-350,000.00
1 Set(MOQ)
10t Eco-Friendly Eaf for Circular Economy Metal Processing
US$329,020.00-598,800.00
1 Piece(MOQ)
Electric Arc Furnace Eaf Steelmaking Ebt Tapping
US$20,000.00-300,000.00
1 Set(MOQ)
2024 New Technology Eaf with Scrap Preheating Function
US$29,020.00-39,980.00
1 Piece(MOQ)
High Efficiency Durable Large Electric Arc Furnace Eaf for Melting Furnace
US$150,000.00-900,000.00
1 Set(MOQ)
Electric Arc Furnace Furnace Wall Toner, Oxygen Spray Gun, Oxygen Oil Gun-Eaf
US$2,000.00-5,000.00
1 Piece(MOQ)
Electric Arc Furnace Eaf for Steel-Making
US$10,000.00-150,000.00
1 Piece(MOQ)
Metallurgical Toner System Spare Parts Eaf
US$500.00-20,000.00
1 Piece(MOQ)
Electric Arc Furnace Eaf for Steel-Making 25tons
US$60,000.00-450,000.00
1 Set(MOQ)
Electric Arc Furnace Furnace Wall Toner, Oxygen Spray Gun, Carbon Gun-Eaf
US$2,000.00-5,000.00
1 Piece(MOQ)
Advanced Top Charging Electric Arc Furnace for Industrial Use
US$350,000.00-1,800,000.00
1 Set(MOQ)
High Quality Manganese Alloy Melting Industrial Electric Arc Furnace
Negotiable
1 Set(MOQ)
4000kVA 10tons Electric Arc Furnace for Steel Scrap Melting (EAF)
US$200,000.00-9,999,999.00
1 Piece(MOQ)



















