Powered by Made-in-China.com
High-Strength 12.7mm Plain PC Strand, Optimized for Rapid Construction Schedules
US$480.65-570.75
25 Tons
Product specifications
Customized
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Pre-in-PostWarranty
ForeverModel NO.
PC STRAND-PLAINCertification
JIS, GB, BS, ASTM, ISO 9001Usage
Beam Bridge, Highway Bridge, Railroad Bridge, TunnelStructure
1*3Material
Reinforced Concrete BearingSurface
PlainShipping Package
Export PackingDelivery Time
7-15daysCoil Weight
2.5-3.5mtStandard
GB/T; En; ASTM; BS; AS/NZS; NBR; JISTransport Package
CustomizedSpecification
15.24mmTrademark
WASUNGENOrigin
Tianjin, ChinaHS Code
7312100000Production Capacity
500000mt/Per YearKey features
Lifetime Warranty Coverage: Provides a forever warranty period for all products.
Multiple International Certifications: Certified by JIS, GB, BS, ASTM, ISO 9001, CE, and prEN standards.
Customizable Surface and Packaging: Offers customized plain surface and export packing options.
Fast Delivery Time: Standard delivery completed within 7 to 15 days.
Versatile Bridge Applications: Suitable for beam bridges, highway bridges, railroad bridges, and tunnels.
Strict Quality Control: Includes raw material inspection, real-time monitoring, and final tensile testing.
OEM Service Available: Accepts customization from samples for production.
High-Strength Material: Features 12.7mm plain PC strand optimized for rapid construction.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤5.44h
About Our Factory & Business Background
Address100 meters from the east section of Taibo South Road, South District, Jinghai Economic Development Zone, Tianjin
Plant Area2500 square meters
Number of Employees27
Registered Capital50,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity25 Tons
Supply Chain Partners4
Our Production Capability & Technical Expertise
Main ProductsPrestressed concrete material
Production Lines6
Production MachinesPeeling equipment, Wire-drawing machine, ynthesizer, Heat treatment equipment
QA/QC inspectors3 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-04-09
Main MarketsSoutheast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Cooperated with Fortune 500No
Product Q&A
Q:Are your products CERTIFIED or INSPECTED?
A:
Yes, our products are usually certified by international certification bodies or inspected by third-party inspection organisations, such as CE certification, ISO 9001 quality management system certification, etc. These certifications and inspections prove the quality and compliance of our products.
Q:Do you offer CUSTOMISED SERVICE for your products?
A:
We can provide customized products according to customers' needs. Whether it is the specification, material or packaging, we can adjust and customize to meet the specific requirements of our customers to meet their particular needs.
Q:What quality control measures do you take during production?
A:
We implement strict quality control throughout the production process: raw materials are inspected for compliance before use; key production steps (e.g., wire drawing, strand stranding) are monitored in real time by professional technicians; and every batch of finished products undergoes tensile strength, anti-corrosion, and dimensional tests before leaving the factory. This ensures no substandard products reach customers.
Q:What is the delivery time for orders?
A:
The standard delivery time is 7 to 15 days.
Q:What is the warranty period for the products?
A:
We provide a forever warranty period for all our products.
Send Inquiry
*To:
Tianjin Wasungen Metal Products Co., Ltd.
Tianjin Wasungen Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Prestressed Structures 12.7mm PC Strand Construction Prestressing for Bridge Engineering
US$610.00-640.00
27 Tons(MOQ)
1X7 PC Strand 12.7mm for Post Tension for Pile Manufactory
US$610.00-640.00
27 Tons(MOQ)
High Quality with 1860MPa Strength Level Steel Strand for Construction Industry
US$0.60-0.90
1,000 kg(MOQ)
High-Strength PC Strand Supplier 9.3mm-15.7mm for Prestressed Concrete Structures
US$510.25-550.36
25 Tons(MOQ)
High Strength High Carbon Steel Strand for Prestressed Concrete
US$0.60-0.90
1,000 kg(MOQ)
12.7mm High Strength Concrete PC Strand Uniform and Durable
US$480.65-570.75
25 Tons(MOQ)
Durable High-Strength Unbonded PC Strand for Global Construction Projects
US$400.00-800.00
25 Tons(MOQ)
Original Factory 12.7mm Cables Unit Weight 7 Wire PC Steel PC Strand
US$610.00-640.00
27 Tons(MOQ)
PC Strands 7 Wires Low Relaxation 9.3mm 12.7mm 1860MPa
US$610.00-640.00
27 Tons(MOQ)
High-Strength Hot Dipped Galvanized PC Strand for Construction
US$700.00-1,000.00
25 Tons(MOQ)
Elastomeric Seismic Isolators for Building and Bridge Constructions
US$100.00-150.00
10 Pieces(MOQ)
Hihigh Damping Natural Rubber Seismic Isolators for Bridges and Buildings.
US$100.00-500.00
20 Pieces(MOQ)
Seismic Isolator & Seismic Isolation for Building and Bridge
US$100.00-200.00
2 Pieces(MOQ)
High Damping Natural Rubber Seismic Isolators
US$100.00-200.00
2 Pieces(MOQ)
Elastomeric Seismic Isolators and Pot Bearings for Vibration Isolation in Buildings and Stadiums.
US$19.00-100.00
20 Pieces(MOQ)
Seismic Isolator, Seismic Isolation, High Damper Bearing for Earthquake Resistance
US$100.00-200.00
2 Pieces(MOQ)
Lead & High Damping Seismic Isolation Rubber Bearing for Bridge
US$20.00-50.00
10 Pieces(MOQ)
Low Friction Large Displacement PTFE Elastomeric Rubber Seismic Isolation Bearing for Bridge
US$20.00-50.00
10 Pieces(MOQ)
Lead Rubber Isolation Bearing with Energy Dissipation Core for Seismic Resistance in Earthquake Zones
US$20.00-50.00
10 Pieces(MOQ)



















