Powered by Made-in-China.com
Heavy-Duty Quick Release Scaffolding Planks for Fast Projects
US$30.00
100-499 Pieces
US$28.00
500-999 Pieces
US$25.00
1,000+ Pieces
Product specifications
P032
Sample price:US$100.00/piece.Request sample
Product profile
After-sales Service
Online ServiceWarranty
1 YearMaterial
MetalType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Single Row ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding PlanksConstruction Properties
Building ScaffoldThickness
1.2mm-2.5mmLength
400mm-6000mm/as Customer's RequirementCustomization
AvailableColor
Customer RequirementsTransport Package
by BundleSpecification
240*45*1.5Trademark
TITAN FORMWORKOrigin
ChinaHS Code
7308400000Key features
Customizable Dimensions: Thickness 1.2-2.5mm and Length 400mm-6000mm available per customer requirements.
High-Quality Metal Material: Durable metal construction designed for heavy-duty scaffolding applications.
1-Year Warranty Coverage: Comprehensive 1-year warranty included for peace of mind and quality assurance.
Professional Quality Inspection: First-class production line with professional inspection teams and test reports.
Global Shipping Solutions: Standard export packaging ensures safe and quick delivery to your site.
Expert Technical Support: Remote or on-site guidance available to assist with installation and usage.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤7.65h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryThe supplier operates an independent, large-scale formwork production base in Tangshan, with more than 120 employees and a broad construction-related business scope. It reports multiple quality, safety, welding, and product certifications. The supplier provides customization from samples and describes technical support covering design consultation, technical adaptation, installation guidance, and operation and maintenance. However, evidence indicates limited formal service-record management, no overseas service infrastructure, no new products launched in the last year, one R&D engineer, and no ODM, SDK, 3D software design, or professional technical-supplier capability. No Fortune 500 cooperation is reported, while repeat-buyer preference is stated at 80%–100%.
Supplier typeThe supplier is explicitly not classified as a professional technique supplier and does not provide 3D software design services. It focuses on formwork products, supported by an independent production base and a business scope covering building materials, metal products, machinery, leasing, and installation.
CertificationsThe supplier reports work safety standardization, ISO 9001-2008, OHSAS 18000, Germany TUV GS, IIW international welding, SGS, EU CPR, and UK BS 1139 certifications. These stated certifications provide explicit evidence of broad quality, safety, welding, and product-compliance coverage.
R&D capabilityInnovation evidence is limited: the supplier has one R&D engineer, launched no new products in the last year, and does not offer ODM, SDK, or 3D software design services. Although it describes innovative technology and product R&D, the explicit capability data indicates a narrow innovation offering.
Production capacityThe supplier reports an independent 300,000-square-meter production base, more than 120 employees, and activities covering formwork R&D, production, sales, service, machinery leasing, and installation. Its stated product selection and adaptability serve residential, commercial, infrastructure, and industrial construction scenarios, supporting a positive production-capability assessment.
Customization capabilityThe supplier explicitly provides customization from samples. It also describes customized technical adaptation within a broader service process, but does not offer ODM services; therefore, its demonstrated customization capability is sample-based rather than broad product-development customization.
Product Q&A
Q:What customization options are available for the scaffolding planks?
A:
We offer customization for thickness (1.2mm-2.5mm) and length (400mm-6000mm) based on customer requirements.
Q:What is the warranty period for this product?
A:
We provide a 1-year warranty for our scaffolding planks.
Q:Do you provide technical support for installation?
A:
Yes, we offer both remote and on-site instruction to ensure customers feel satisfied and at ease.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 Tons.
Q:What are the payment terms?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and Small-amount payment.
Send Inquiry
*To:Tianjin Tiantai Formwork & Scaffolding Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffolding Plank for Heavy Duty Layher Ringlock Scaffold Construction
US$4.00-12.00
100 Pieces(MOQ)
Wholesale Heavy Duty Scaffolding Steel Plank Walkboards for Frame System Construction
US$4.00-12.00
100 Pieces(MOQ)
Heavy Duty Perforated Galvanized Stainless Steel Scaffold Plank for Scaffolding System
US$45.00-48.00
30 Sets(MOQ)
Heavy Duty Perforated Galvanized Stainless Steel Scaffold Plank for Cuplock Scaffolding System
US$45.00-48.00
30 Sets(MOQ)
Heavy Duty Galvanized Scaffolding Steel Planks Catwalk for Construction Industry
US$2.00-10.00
100 Pieces(MOQ)
Customizable Galvanized Metal Scaffolding Plank for Heavy Projects
US$9.00-15.00
1 Ton(MOQ)
Heavy-Duty Cuplock System Scaffolding Steel Plank for Construction
US$10.87-25.87
200 Pieces(MOQ)
Heavy Duty Steel Scaffolding Planks for Safe Loading Platforms
US$500.00-750.00
1 Ton(MOQ)
Heavy-Duty Steel Plank with Metal Plate for Construction Projects
US$5.00-18.00
2,000 Pieces(MOQ)
Heavy-Duty Galvanized Scaffolding Plank Durable and Easy to Assemble for Construction Sites
US$9.00-15.00
1 Ton(MOQ)
Heavy-Duty Metal Plank Scaffolding Decking for Construction Projects
US$9.90
200 Pieces(MOQ)
Heavy Duty Steel Scaffold Board Industrial Walkway Plank for Project
US$4.20-15.50
100 Pieces(MOQ)
Heavy-Duty Metal Deck Scaffolding Plank for Safe Work Platforms
US$1,050.00-1,100.00
20 Tons(MOQ)
Heavy Duty Steel Scaffolding Planks for Safe Loading Platforms
US$1,050.00-1,100.00
20 Tons(MOQ)
Heavy-Duty Metal Plank for Scaffolding and Construction Projects
US$9.90
200 Pieces(MOQ)
Heavy-Duty 320mm Steel Scaffolding Plank for Construction Projects
US$20.00-50.00
200 Pieces(MOQ)
Heavy Duty Anti-Slip Safety Scaffold Steel Plank for Kwikstage Frame Scaffolding
US$20.00-28.00
500 Pieces(MOQ)
Heavy-Duty Galvanized Perforated Scaffold Plank for Construction Projects
US$1,000.00
1,000 Pieces(MOQ)
Heavy Duty Steel Plank for Scaffolding Walkway Platform
US$2.00-10.00
100 Pieces(MOQ)
Heavy-Duty Steel and Aluminum Corner Plank for Layher Systems
US$1,050.00-1,100.00
20 Tons(MOQ)



















