SourcingAI
Try for free
Powered by Made-in-China.com
Robust Ringlock Scaffolding Solution for Reliable Site Support
US$100.00
1 Piece

Product specifications

Q06

Sample price:US$100.00/piece.Request sample

Product profile

After-sales Service

Online Technical Support

Warranty

1 Year

Material

Steel

Model NO.

H-092

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Cross Ring Scaffolding

Erection Position

External Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Planks

Construction Properties

Building Scaffold

Thickness

2.75mm

Length

250mm-6000mm/as Customer's Requirement

Customization

Available

Color

Customer Requirements

Transport Package

Pallet

Specification

48.3*3.25

Trademark

TITAN FORMWORK

Origin

China

HS Code

7308400000

Key features

Quick Erection & Dismantling: Pre-measured components require only a hammer for assembly, replacing traditional bolts.
High Stability Design: Features pre-welded connectors and rosette-type central points for secure triangular units.
Customizable Dimensions: Lengths range from 250mm to 6000mm and thickness is 2.75mm, tailored to customer requirements.
Diverse Surface Treatments: Available in High Protected Painted, Powder Coating, Electric Galvanized, and Hot Dip Galvanized.
Long Life Span: Connected with CO2 arc welding to ensure excellent cracking and deformation resistance.
Multi-Function Application: Suitable for buildings, bridges, tunnels, offshore construction, and industrial maintenance.
1-Year Warranty Coverage: Includes 1-year warranty period for peace of mind and product reliability.
Online Technical Support: Remote or on-site guidance available to ensure customer satisfaction throughout the process.

Company profile

Importers and ExportersHigh Repeat Buyers Choice
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.83h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryThe supplier specializes in formwork products for the construction industry, with a strong focus on customization and quality certifications. Despite a lack of overseas presence and innovation in new products, the company maintains a high rate of repeat buyers and comprehensive certifications. It does not engage in collaborations with Fortune 500 companies, and its financial records indicate no revenue or costs from the last year. The supplier operates from a large production base in Hebei, China, but lacks significant R&D capabilities.
Supplier typeThe supplier is involved in the production of formwork products, with services extending to technical adaptation and installation guidance, but it is not a professional technique supplier.
CertificationsThe supplier holds multiple certifications including ISO 9001, OHSAS 18000, and various international safety and quality certifications.
Financial creditThe supplier's financial records from last year show no operating revenue or costs, indicating a lack of financial activity.
R&D capabilityThe supplier has not launched any new products in the past year and lacks professional R&D capabilities.
Production capacityWith a large production base and over 120 employees, the supplier is well-equipped for large-scale production of formwork products.
Customization capabilityThe supplier offers customization from samples, indicating a capacity to tailor products to client needs.

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty for our scaffolding systems.
Q:Can the scaffolding dimensions be customized?
A:
Yes, lengths can be customized from 250mm to 6000mm, and thickness is 2.75mm based on customer requirements.
Q:What surface treatments are available?
A:
Options include High Protected Painted, Powder Coating, Electric Galvanized, and Hot Dip Galvanized.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:How long does production take?
A:
For a full container, production typically takes 20-30 days after receiving the down payment.

Send Inquiry

*To:Tianjin Tiantai Formwork & Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like