SourcingAI
Try for free
Powered by Made-in-China.com
Scaffolding Material Modern Heavy Galvanized Metal Concrete Building Construction Ringlock Scaffold
US$15.00
500-998 Pieces
US$12.50
999-1,998 Pieces
US$10.00
1,999+ Pieces

Product specifications

L032

Sample price:US$100.00/piece.Request sample

Product profile

After-sales Service

Yes

Warranty

2 Years

Material

Steel

Model NO.

Ringlock-1

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Cross Ring Scaffolding

Erection Position

External Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Planks

Construction Properties

Building Scaffold

Thickness

2.75mm

Length

250mm-6000mm/as Customer's Requirement

Customization

Available

Color

Customer Requirements

Transport Package

Pallet

Specification

48.3*3.25

Trademark

TITAN FORMWORK

Origin

China

HS Code

7308400000

Key features

Quick Erection System: Pre-measured components with gravity-assisted wedge locks allow fast assembly without bolts.
High Stability Design: Eight-hole rosette and diagonal braces form stable triangular units for robust support.
Durable Construction: CO2 arc welding ensures cracking and deformation resistance for a long lifespan.
Customizable Dimensions: Lengths from 250mm to 6000mm and colors are customizable to customer requirements.
Multi-Purpose Application: Suitable for building construction, bridges, tunnels, offshore projects, and industrial maintenance.
Professional Quality Control: Professional inspection team ensures zero defects and provides test reports for compliance.
Comprehensive Support: Offers remote or on-site guidance, design proposals, and technical support throughout the process.
Flexible Packaging: Standard export packaging including bundles, pallets, or wooden cases based on customer request.

Company profile

Importers and ExportersHigh Repeat Buyers Choice
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.10h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryThe supplier specializes in formwork products for the construction industry, with a strong focus on customization and quality certifications. Despite a lack of overseas presence and innovation in new products, the company maintains a high rate of repeat buyers and comprehensive certifications. It does not engage in collaborations with Fortune 500 companies, and its financial records indicate no revenue or costs from the last year. The supplier operates from a large production base in Hebei, China, but lacks significant R&D capabilities.
Supplier typeThe supplier is involved in the production of formwork products, with services extending to technical adaptation and installation guidance, but it is not a professional technique supplier.
CertificationsThe supplier holds multiple certifications including ISO 9001, OHSAS 18000, and various international safety and quality certifications.
Financial creditThe supplier's financial records from last year show no operating revenue or costs, indicating a lack of financial activity.
R&D capabilityThe supplier has not launched any new products in the past year and lacks professional R&D capabilities.
Production capacityWith a large production base and over 120 employees, the supplier is well-equipped for large-scale production of formwork products.
Customization capabilityThe supplier offers customization from samples, indicating a capacity to tailor products to client needs.

Product Q&A

Q:What is the warranty period for the scaffolding?
A:
We provide a 2-year warranty for our scaffolding products.
Q:What materials are used for the Ringlock scaffolding?
A:
The scaffolding is made of high-quality steel, specifically Q355 or Q235 standard.
Q:Can the scaffolding dimensions be customized?
A:
Yes, lengths from 250mm to 6000mm and colors can be customized according to customer requirements.
Q:What is the production lead time?
A:
For a full container, production typically takes 20-30 days after receiving the down payment.
Q:What is the Minimum Order Quantity (MOQ)?
A:
The Minimum Order Quantity is 28 Tons.

Send Inquiry

*To:Tianjin Tiantai Formwork & Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like