SourcingAI
Try for free
Powered by Made-in-China.com
a Frame Prefabricated House Kits Light Steel Triangle Cabin
US$330.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Online Guidance

Certification

CE, ISO9001

Model NO.

customized

Customized Or Not

Customized

Material

Steel Structure

Frame

Galvanized Square Tube

Roof

Metal Insolated Panels+OSB Panel+Decoration Panel

Drainage

Natural Drainage

Storey

1storey 2 Storey

Building Style

Loft

Weight

4-8tons

Area

28sqm-72sqm

Production Time

15-45days

Installation Time

7 Days/Unit

Installation Work

4-5 Person

Loading

1-2units/40hqshipping Container

Designing Life-Span

20years

Floor Loading

2.0kN/Sqm

Roof Loading

0.5kN/Sqm

Transport Package

by Shipping Container

Specification

customized

Trademark

tiga

Origin

China

HS Code

94069000

Production Capacity

5000

Key features

Customizable Design: Customized color, storey, and building style available to meet specific needs.
Fast Production: Production time ranges from 15 to 45 days depending on customization.
Easy Installation: Quick setup with 7 days per unit requiring only 4-5 workers.
High Quality Certification: Certified with CE and ISO9001 standards for safety and reliability.
Durable Structure: Constructed with galvanized square tubes and steel frames for longevity.
Versatile Application: Ideal for hotels, forest retreats, vacation homes, or primary residence.
Spacious Options: Available in 20ft or 40ft sizes with areas from 28 to 72 sqm.
1-Year Warranty: Comprehensive 1-year warranty coverage for peace of mind.

Company profile

Henan Tiga Engineering Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceExhibition ExperienceFast Delivery
Business Type: Manufacturer/FactoryExport Year: 2014-10-15Nearest Port: Qingdao, TianjinAverage Response Time: ≤8.80hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CIP, CPT

AI-Powered supplier vetting

SummaryThe supplier operates across building, decorative, metal, plastic, wooden, glass, chemical, mechanical, electronic, electrical, and steel-structure-related products and services. It provides 3D software design and multiple forms of customization, including full, design-based, sample-based, minor, and flexible customization. Production resources include five lines covering decoiling, corrugating, bending, and punching, with documented and consistently followed finished-product inspection instructions. Export sales represent 71%–90% of total sales, and the supplier reports a one-month average lead time in both peak and off-season periods. Strengths include CE certification, regular fire drills, raw-material traceability, quality assurance, and references to major infrastructure projects. Limitations include no SDK, no in-stock or overseas warehouse/showroom capability, no environmental impact assessment report, no continuous quantity reconciliation, no outsourcing SOP, and no valid manufacturing contract...
CertificationsThe supplier has CE certification. This is explicit evidence of holding at least one product or compliance certification, but no broader certification portfolio is provided.
Production capacityThe supplier reports five production lines, including decoiling, two corrugating machines, bending, and punching equipment, with standardized finished-product inspection instructions that are uniformly followed. Its export-sales share is 71%–90% and average lead time is one month in both seasons, but capacity controls are weakened by the absence of continuous quantity reconciliation, an outsourcing SOP, and a valid manufacturing contract with related subcontractors.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. It also provides 3D software design services, directly supporting a broad customization offering.
Client casesThe supplier states that its products have been supplied for major projects including the Olympic Sailing Center, Jiaozhou Gulf Bay Bridge, and Qingdao Cross-Sea Tunnel. These named infrastructure references provide explicit evidence of project experience, although the slices do not specify the supplier's exact scope or performance in each project.

Product Q&A

Q:Is the product customizable?
A:
Yes, the product is fully customized. You can choose the color, storey (1 or 2), building style (e.g., Loft), and specific dimensions.
Q:What is the production time?
A:
The production time typically ranges from 15 to 45 days, depending on the specific customization requirements.
Q:How long does installation take?
A:
Installation takes approximately 7 days per unit and requires a team of 4-5 workers.
Q:What certifications does the house have?
A:
The house is certified with CE and ISO9001 standards.
Q:What is the warranty period?
A:
We provide a 1-year warranty for the product.

Send Inquiry

*To:Henan Tiga Engineering Co., Ltd.Henan Tiga Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Cheap Prefab Light Steel Frame Kit House

Cheap Prefab Light Steel Frame Kit House

US$40.00-65.00
300 Square Meters(MOQ)
Made-in-China.com
Prefabricated Steel Frame Panel Kit Ready Built Houses

Prefabricated Steel Frame Panel Kit Ready Built Houses

US$40.00-65.00
300 Square Meters(MOQ)
Made-in-China.com