SourcingAI
Try for free
Powered by Made-in-China.com
Prefabricated Light Steel Structural Frame Townhouse
US$400.00-460.00
100 Square Meters

Product profile

Customization

Available

After-sales Service

Engineer Online Service

Architecture

Modern Style

Model NO.

0.12-1.5mm

Type

Row Villa

Standard

GB, DIN, JIS

Steel Type

Quality Carbon Structural

Forming

Cold Drawn Steel

Connection Form

Bolt Connection

Member

Steel Beam

Type of Steel for Building Structure

High-Strength Steel

Application

Steel Workshop

Transport Package

Sea Worthy

Specification

Customized

Trademark

Tiga

Origin

China(Mainland)

HS Code

94069000

Key features

Corrosion and Weather Resistance: Villa is corrosion resistant, heat and sound insulated, and wind and moisture proof.
Seismic Safety: Features anti-seismic properties ensuring structural safety in earthquake zones.
Fast Construction: Short construction period with fast assembly and disassembly capabilities.
Eco-Friendly and Recyclable: 100% recyclable materials with low cost and energy efficient design.
High-Strength Steel Structure: Uses Q345 or Q235 H shape columns and beams for strong bearing ability.
Customizable Design: Flexible and customized options available for various commercial applications.
Low Maintenance: Virtually maintenance free with durable and long-lasting construction.
Compliance with Standards: Meets GB, DIN, and JIS standards for standard building structures.

Company profile

Henan Tiga Engineering Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceExhibition ExperienceFast Delivery
Business Type: Manufacturer/FactoryExport Year: 2014-10-15Nearest Port: Qingdao, TianjinAverage Response Time: ≤6.52hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CIP, CPT

AI-Powered supplier vetting

SummaryThe supplier operates across building, decorative, metal, plastic, wooden, glass, chemical, mechanical, electronic, electrical, and steel-structure-related products and services. It provides 3D software design and multiple forms of customization, including full, design-based, sample-based, minor, and flexible customization. Production resources include five lines covering decoiling, corrugating, bending, and punching, with documented and consistently followed finished-product inspection instructions. Export sales represent 71%–90% of total sales, and the supplier reports a one-month average lead time in both peak and off-season periods. Strengths include CE certification, regular fire drills, raw-material traceability, quality assurance, and references to major infrastructure projects. Limitations include no SDK, no in-stock or overseas warehouse/showroom capability, no environmental impact assessment report, no continuous quantity reconciliation, no outsourcing SOP, and no valid manufacturing contract...
CertificationsThe supplier has CE certification. This is explicit evidence of holding at least one product or compliance certification, but no broader certification portfolio is provided.
Production capacityThe supplier reports five production lines, including decoiling, two corrugating machines, bending, and punching equipment, with standardized finished-product inspection instructions that are uniformly followed. Its export-sales share is 71%–90% and average lead time is one month in both seasons, but capacity controls are weakened by the absence of continuous quantity reconciliation, an outsourcing SOP, and a valid manufacturing contract with related subcontractors.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. It also provides 3D software design services, directly supporting a broad customization offering.
Client casesThe supplier states that its products have been supplied for major projects including the Olympic Sailing Center, Jiaozhou Gulf Bay Bridge, and Qingdao Cross-Sea Tunnel. These named infrastructure references provide explicit evidence of project experience, although the slices do not specify the supplier's exact scope or performance in each project.

Product Q&A

Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak and off-peak seasons.
Q:What payment methods are accepted?
A:
We accept LC, T/T, PayPal, Western Union, Small-amount payment, and Money Gram.
Q:Is the building customizable?
A:
Yes, the prefab villa is flexible and customized to meet specific requirements.
Q:What materials are used for the structure?
A:
Main structure uses Q345 or Q235 steel, with bolt connections and anti-rust treatment.
Q:Does the villa have seismic protection?
A:
Yes, the villa features anti-seismic properties for enhanced safety.

Send Inquiry

*To:Henan Tiga Engineering Co., Ltd.Henan Tiga Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Light Steel Structure Villa Home Frame
Made-in-China.com
Prefabricated Steel Structure House Frame

Prefabricated Steel Structure House Frame

US$220.00-240.00
200 Square Meters(MOQ)
Made-in-China.com
Residential Steel Structure Frame Construction (KXD-MH1095)
Made-in-China.com
Acoustic Single Cabin with Durable Aluminum Frame Build
Made-in-China.com