Powered by Made-in-China.com
Q235B Heavy Prefabricated Metal Light Steel Structure Pre-Engineered Steel Frame Building
US$30.00-50.00
100 Square Meters
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableStructure
Steel StructureApplication
Steel Workshop, Steel Structure Platform, Steel FaModel NO.
TIGA-10201Materials Type
H Beam or I Beam with Q235 or Q345Derusting
Ball BlastWindow
PVC Window or Plastic Steel WindowDoors
Color Steel Sliding Door or Electric Rolling GateSize
as Your RequirementsCertificate
ISO9001, ISO14001Walls
EPS, Rock Wool, PU Sandwich Panel, Color Steel SheetRoofs
EPS, Rock Wool, PU Sandwich Panel, Color Steel SheetDimensions
According to The Need of DesignDesigns and Drawings
According to Your Needs to DesignBusiness Type
FactoryConnection
BoltsEarthquake Resistance
Grade 10Sound Insulation
30-40dBMaterial
Sandwich PanelUsage
Warehouse, Villa, Dormitories, Temporary Offices, WorkshopCertification
ISO, CECustomized
CustomizedTransport Package
Seaworthy PackageSpecification
100-100, 000 SQMTrademark
TIGAOrigin
ChinaHS Code
940600Production Capacity
500, 000 Sqm / YearKey features
70-Year Service Life: Designed for durability with a service life of up to 70 years.
Wide Span Capability: Supports single or multiple spans with a max clear span of 36m without central columns.
Customized Dimensions: Dimensions and designs are customized according to your specific requirements and needs.
Cost-Effective Pricing: Average price ranges from USD 30/sqm to USD 90/sqm for high value.
Fast Construction: From production to finishing installation, the process takes only several months.
High Earthquake Resistance: Features Grade 10 earthquake resistance for enhanced safety and stability.
Eco-Friendly Design: Green, environmental, energy-saving, anti-fire, and water-proof construction.
Professional Engineering Team: Backed by a team of professional engineers and technical workers since 1998.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2014-10-15Nearest Port: Qingdao, TianjinAverage Response Time: ≤6.38hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CIP, CPT
AI-Powered supplier vetting
SummaryThe supplier operates across building, decorative, metal, plastic, wooden, glass, chemical, mechanical, electronic, electrical, and steel-structure-related products and services. It provides 3D software design and multiple forms of customization, including full, design-based, sample-based, minor, and flexible customization. Production resources include five lines covering decoiling, corrugating, bending, and punching, with documented and consistently followed finished-product inspection instructions. Export sales represent 71%–90% of total sales, and the supplier reports a one-month average lead time in both peak and off-season periods. Strengths include CE certification, regular fire drills, raw-material traceability, quality assurance, and references to major infrastructure projects. Limitations include no SDK, no in-stock or overseas warehouse/showroom capability, no environmental impact assessment report, no continuous quantity reconciliation, no outsourcing SOP, and no valid manufacturing contract...
CertificationsThe supplier has CE certification. This is explicit evidence of holding at least one product or compliance certification, but no broader certification portfolio is provided.
Production capacityThe supplier reports five production lines, including decoiling, two corrugating machines, bending, and punching equipment, with standardized finished-product inspection instructions that are uniformly followed. Its export-sales share is 71%–90% and average lead time is one month in both seasons, but capacity controls are weakened by the absence of continuous quantity reconciliation, an outsourcing SOP, and a valid manufacturing contract with related subcontractors.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. It also provides 3D software design services, directly supporting a broad customization offering.
Client casesThe supplier states that its products have been supplied for major projects including the Olympic Sailing Center, Jiaozhou Gulf Bay Bridge, and Qingdao Cross-Sea Tunnel. These named infrastructure references provide explicit evidence of project experience, although the slices do not specify the supplier's exact scope or performance in each project.
Product Q&A
Q:What is the maximum clear span available?
A:
The building supports single and multiple spans with a maximum clear span of 36 meters without requiring central columns.
Q:How long is the service life of this structure?
A:
The structure is designed for durability with a service life of up to 70 years.
Q:Can the dimensions and design be customized?
A:
Yes, dimensions and designs are fully customized according to your specific requirements and needs.
Q:What is the price range for this building?
A:
The average price is cost-effective, ranging from USD 30/sqm to USD 90/sqm.
Q:How long does the construction process take?
A:
Construction is fast; from production to finishing installation, it typically takes only several months.
Send Inquiry
*To:
Henan Tiga Engineering Co., Ltd.
Henan Tiga Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Agricultural Prefab Lightweight Steel Frame Structure Insulated Metal Buildings
US$37.00-53.00
1,000 Square Meters(MOQ)
Professional Prefabricated Steel Building for Warehouse/Steel Shed/Workshop/Storage/Steel Structure/Construction Building with FM/CE/Q235B/Q355b
US$40.00-60.00
2,000 Square Meters(MOQ)
Frame Steel Structure Building Prefabricated for Shopping Center
US$20.00-45.00
200 Tons(MOQ)
Customized Steel Structure Building Prefabricated Portable Metal Storage Hangar Shed Building
US$15.00-45.00
500 Square Meters(MOQ)
Heavy Gauge Peb Industrial Steel Structure Pre-Engineered Building Construction
US$35.00-95.00
200 Square Meters(MOQ)
Prefabricated Metal Building Frame Steel Structure Building
US$20.00-35.00
200 Square Meters(MOQ)
Prefabricated Steel House Light Steel Structure Metal Frame Office Commercial Building Construction
US$1,000.00-2,500.00
100 Tons(MOQ)
Industrial Hall Steel Building/Steel Structure/Construction Prefab Storage/Shed/Prefabricated Building/Workshop/Prefab Metal Warehouse
US$20.00-50.00
50 Square Meters(MOQ)
Commercial Metal Steel Frame Prefab Structure Building Epoxy Coated S355jr
US$1,300.00-3,000.00
100 Tons(MOQ)
Prefab Light Steel Structure Metal Construction Prefabricated Building
US$30.00-120.00
1 Square Meter(MOQ)
Steel Structure Kits Prefabricated Storage Farm Shed Portable House Steel Structure Building
US$35.00-55.00
100 Square Meters(MOQ)
Customized Prefabricated Engineered Steel Structure Building for Workshop Warehouse Hangar Showroom Supermarket
US$15.00-45.00
500 Square Meters(MOQ)
CE Certification Office in Solomon Light Steel Structure Prefabricated Building
US$35.00-50.00
100 Square Meters(MOQ)
Prefabricated Steel Structure Warehouse Metal Shed Steel Building
US$35.00-70.00
500 Square Meters(MOQ)
China Cheap Prefab Metal Frame Light Prefabricated Steel Warehouse Structure Workshop Building Factory Shed Construction Drawing
US$28.00-33.00
1,000 Square Meters(MOQ)
Prefabricated Steel Structure Metal Shed Steel Frame Hall Workshop Warehouse Building
US$25.00-65.00
200 Square Meters(MOQ)



















