CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 12 Years CertifiedNearest Port: Shenzhen Port, Guangzhou PortAverage Response Time: ≤1.05h
AI-Powered supplier vetting
SummaryThe supplier specializes in high-end enamel equipment and related automation technologies, offering advanced customization and design services. They maintain rigorous quality control, evidenced by ISO9001:2015 certification and a high preference rate from repeat buyers. However, they have not launched new products recently and lack overseas facilities and trade show participation. Financially, the supplier shows no growth, with zero revenue and profit over the past few years.
Supplier typeThe supplier is engaged in research, development, manufacturing, sales, and service of high-end enamel equipment and automation technologies.
CertificationsThe supplier holds an ISO9001:2015 certification, indicating compliance with quality management standards.
After-Sales capabilityThe supplier has a clear procedure for handling customer complaints and maintaining quality assurance processes.
Financial creditThe supplier exhibits no financial growth, with zero revenue, profit, and cash flow over the past two years.
R&D capabilityThe supplier has not introduced new products in the last year and lacks an SDK for R&D, indicating limited innovation capability.
Production capacityThe supplier maintains manufacturing contracts and in-stock service capacity but lacks overseas warehouse management.
Customization capabilityThe supplier offers extensive customization services, from minor to full customization, supported by R&D capabilities.
Product Q&A
Q:How long does it take to produce the equipment we ordered?
A:
The production lead time depends on specific customization requirements. For a complete coating line, the standard production cycle is 30-70 days. Special configurations may require a detailed timeline after confirming the technical plan.
Q:If I want to discuss product procurement with you, what information do I need to provide?
A:
Please share: 1) Type of workpieces; 2) Max and regular dimensions; 3) Weight range; 4) Expected daily output; 5) Coating process requirements; 6) Curing conditions; 7) Available factory space dimensions.
Q:How will you install the equipment we ordered? And how long will the installation take?
A:
We provide turnkey installation and commissioning by professional engineers. Installation duration is generally 30-60 days depending on complexity. The buyer bears travel, accommodation, and meal costs for engineers.
Q:What after-sales services do you provide?
A:
Services include: 1) Free wearing parts and 3-7 day spare parts delivery; 2) Maintenance manual and online training; 3) Remote support within 2 hours or on-site support within 5-10 days; 4) 12-month warranty covering free repairs for non-human damage.
Q:What is the warranty period for the equipment?
A:
All equipment comes with a 12-month warranty starting from the date of successful commissioning. During this period, faulty components (excluding human damage) are repaired or replaced free of charge.
Send Inquiry
*To:Dongguan Tims Automatic Equipment Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email