Powered by Made-in-China.com
Heavy Duty Scaffolding Base Plate for Construction
US$1.00-23.00
1,000 Pieces
Sample price:US$1.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Quality GuaranteedWarranty
Quality GuaranteedModel NO.
A2Material
SteelType
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Single Row ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding PropsConstruction Properties
Building ScaffoldCustomer Color
YesCustomer Size
YesDrawing
SupportedPacking
Bag/CatonSurface Treatment
Painter/GalvanizedTransport Package
in BundleSpecification
Standard or customizedTrademark
HENGFENGJINDAOrigin
Tianjin ChinaHS Code
73084000Production Capacity
200000sets/MonthKey features
Customizable Dimensions: Customer size options available to meet specific project requirements.
Customizable Colors: Customer color options available including Galvanized, Painted, or Powder coated.
Drawing Support: Non-standard products can be produced according to customer drawings.
High Quality Material: Constructed from Q195/Q235/Q355 steel with thickness ranging from 1.4-4.0mm.
ISO9001 Certified: Manufacturing process certified under ISO9001 quality management system.
Large Production Capacity: Monthly production capacity reaches approximately 200,000 sets of steel props.
Global Shipping: Products shipped to over 40 countries including USA, UK, Canada, and Germany.
OEM/ODM Service: Full OEM and ODM services available for custom manufacturing needs.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 17 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.97h
AI-Powered supplier vetting
SummaryThe supplier demonstrates substantial manufacturing capacity for scaffolding and steel props, with five production lines, stated annual outputs of 2,500,000 scaffolding sets and 2,400,000 steel prop sets, and approximately one-month lead times in both peak and off-peak periods. It has extensive export experience, with 90% of sales from exports and 17 years of exporting, serving Southeast Asia, the Middle East, Europe, and North America. Customization, OEM, ODM, and recent product development are supported. Quality assurance and written supplier-service assessment procedures are reported, but complaint handling and corrective-action procedures lack written records. The supplier has inventory capability and has attended the Canton Fair, but lacks overseas warehouses, showrooms, agents, and branches. No certification information or customer case details are provided. Financial information is incomplete and internally unclear, so financial credibility cannot be reliably assessed.
Supplier typeThe supplier is explicitly identified as not being a professional technical supplier and does not provide 3D software design services. However, it provides manufacturing-oriented customization and offers OEM and ODM services, indicating a product manufacturer rather than a software or professional technical-service provider.
After-Sales capabilityThe supplier has inventory capability, quality assurance, and written procedures with follow-up records for assessing service capability. However, its corrective-action and customer-complaint procedures have no written records, and it has no overseas warehouse, showroom, agent, or branch support; this indicates limited documented and geographically local after-sales coverage.
R&D capabilityThe supplier reported new products during the past year and provides ODM and OEM services, supporting product-development capability. Nevertheless, it lacks an available SDK and is not a professional technical supplier, so the evidence supports manufacturing innovation but not broader technical-development capability.
Production capacityThe supplier operates five production lines and reports annual outputs of 2,500,000 scaffolding sets and 2,400,000 steel prop sets. It has relevant cutting, drilling, threading, CNC, punching, and derusting equipment, inventory capability, one-month peak and off-peak lead times, and a finished-product inspection instruction that is uniformly followed.
Customization capabilityThe supplier explicitly supports customization from samples, customization from designs, full customization, flexible customization, and minor customization. Its ODM and OEM services further support the conclusion that it can adapt or develop products for customer requirements.
Product Q&A
Q:Does your company can customize according my demands?
A:
Yes sir/Madam. Our machines are all customized according to customers' requests.
Q:Where is your overseas markets?
A:
Our products are well distributed to many countries such as USA, Ran, Dubai, Singapore, South Africa, UK, Europe,Germany, India, et..
Q:What's the delivery time?
A:
I Around 20-~30days. However, based on your order and current storage, we can adjust.
Send Inquiry
*To:
Tianjin Hengfengjinda Metal Structure Co., Ltd.
Tianjin Hengfengjinda Metal Structure Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy Duty Galvanized Post Base Plate for Shoring Frame
US$2.90-3.90
1,000 Pieces(MOQ)
Heavy-Duty Steel Connection Plates for Reliable Scaffolding Systems
US$700.00-750.00
5 Tons(MOQ)
Standard Base Plate for Heavy Duty Ring Lock Scaffolding Systems
US$3.50-7.00
500 Pieces(MOQ)
Heavy-Duty Pre-Galvanized Steel Plank and Metal Plate for Construction
US$6.00-18.00
2,000 Pieces(MOQ)
Adjustable Scaffolding Scaffolding Base Plate for Construction
US$4.00-5.00
100 Pieces(MOQ)
Heavy-Duty Galvanized Scaffolding Rose Flower Plate for Construction
US$700.00-750.00
5 Tons(MOQ)
Scaffolding Accessories Scaffolding Base Plate for Scaffolding Construction
US$0.30-3.00
1,000 Pieces(MOQ)
Experienced Galvanized Scaffold Base Plate for Scaffolding Construction Equipment
US$2.00-2.20
1,000 Pieces(MOQ)
Best Price BS1139 En74 Scaffolding Foot Base Plate for Shell Construction Project
US$2.00-2.20
1,000 Pieces(MOQ)
Heavy Duty Universal Scaffold Base Plate – Compatible with Ringlock & Layher
US$1.00-10.00
50 Pieces(MOQ)
Pre-Galvanized Steel Plank and Metal Plate for Heavy-Duty Applications
US$6.00-18.00
2,000 Pieces(MOQ)
Australia Market Solid Screw Jack/Levelling Base Plate for Kwikstage Scaffolding
US$5.10-8.00
200 Pieces(MOQ)
Top Sale Construction Formwork Scaffold Base Plate for System and Frame Scaffolding
US$2.00-2.20
1,000 Pieces(MOQ)
Scaffold Base Plate 220mm Diameter Plastic Scaffolding Base Plates for Scaffold Poles
US$4.54-5.15
1,000 Pieces(MOQ)
Steel Base Jake Plate for Ringlock Scaffolding System Manufacturer Shandong
US$2.00-10.00
100 Pieces(MOQ)
Q235 HDG Screw Jack Part Base Plate Scaffolding for Construction
US$1.20-1.58
100 Pieces(MOQ)
Heavy-Duty Anti-Corrosion Scaffolding Upright with Decorative Rose Plate
US$700.00-750.00
5 Tons(MOQ)
Heavy Duty PP Anti-UV Flame Retardant Material Scaffold Sole Base Plate
US$4.35-5.15
1,000 Pieces(MOQ)
En74 Standard Construction Metal Scaffolding System Socket Base Plate with Spigot
US$1.20-3.00
200 Pieces(MOQ)
Heavy-Duty Galvanized Steel Scaffolding Accessories with Floral Plate
US$700.00-750.00
5 Tons(MOQ)



















