SourcingAI
Try for free
Powered by Made-in-China.com
Energy Efficient Gas Heating System for Electrostatic Powder Coating Production Line
US$50,000.00-300,000.00
1 Set

Product profile

Customization

Available

Application Method

Electrostatic Spray

Coating Material

Powder

Voltage

Customized

Warranty

1 Years

Substrate

Metal

Type

Powder Coating Line Equipment

Color

Customized

Certification

CE, ISO

Transport Package

Cartons/Customized

Specification

Customized

Trademark

HUAQUAN

Origin

China

HS Code

842489999

Production Capacity

20sets/Year

Key features

Energy Efficient Heating: Double cycle heating system for better furnace temperature uniformity and energy efficiency.
Explosion-Proof Safety: Anti-explosion spray room with venting, flame retardant materials, and explosion-proof components.
Advanced PLC Control: Integrated PLC and touch screen control using international brands like Siemens for stable performance.
Customizable Voltage: Voltage is customized to meet specific client requirements and local standards.
High Adhesion Pre-treatment: Pre-spray treatment including degreasing and rinsing to enhance coating adhesion and corrosion resistance.
Dust-Proof Conveyor: Suspended conveyor system with dust-proof structure to prevent workpiece contamination.
Environmental Protection: Equipped with waste gas and waste water purification equipment for cleaner production.
Quality Assurance: Third-party inspection accepted; 100% refund support for unsolvable quality problems.

Company profile

Business Type: Manufacturer/FactoryAverage Response Time: >24h

About Our Factory & Business Background

AddressNo. 2 Fuli Road, Koudong Development Zone, Baodi District, Tianjin, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsPowder Coating System Production Line, Fitness Equipment Automatic Coating Production L, Metal Furniture Powder Coating Line, Cabinet Powder Coating Line, Agricultural Machinery Coating Production Line, Electrostatic Powder Coating Line, Auto Parts Powder Spraying Production Line Equip, Industrial Powder Coating Eauipment, Electrostatic Powder Coating Machine

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for the equipment?
A:
We provide a 1-year warranty for the equipment.
Q:Can the voltage be customized?
A:
Yes, the voltage is customized to suit your specific needs.
Q:What is the lead time for production?
A:
The lead time is 1-3 months during the off-season and 3-6 months during the peak season.
Q:Do you accept third-party inspections?
A:
Yes, third-party inspection is acceptable after production.
Q:What payment methods do you support?
A:
We accept multiple payment methods; please contact us for details.

Send Inquiry

*To:Tianjin Huaquan Environmental Protection Technology Co., LtdTianjin Huaquan Environmental Protection Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Hurricance Recovery System for Powder Coating Line
Made-in-China.com