SourcingAI
Try for free
Powered by Made-in-China.com
Customizable Steel Construction Warehouses for Optimal Space Utilization
US$600.00-2,500.00
1,000 Square Meters

Product profile

Customization

Available

After-sales Service

Online Guidance

Connection Form

Bolt Connection

Model NO.

Q355

Construction Member

Steel Beam

Grade

Carbon Structural Steel

Molding Method

Cast Steel

Residential Wall Structure

Top Wall Beam

Standard

GB

Steel Type

High-Strength Steel

Structure

Frame Structure

Structural Performance Attributes

High Strength

Material Attributes

Good Weldability

Construction Attributes

Fast Construction Speed

Usage Function Attributes

Large Spatial Flexibility

Appearance and Modeling Attributes

Strong Modern Sense

Transport Package

Roro Ships, Barges or Vehicles with Special Loadin

Specification

Q345B / Q460C

Trademark

TKDN

Origin

Zhengzhou, Henan, China

HS Code

7308900000

Production Capacity

5000, 000 T Per Year.

Key features

High Strength & Safety: Carbon structural steel with excellent toughness, ductility, and seismic resistance.
Fast Prefabricated Construction: Factory prefabricated and bolt-connected assembly, significantly shortening project cycles.
Large Span Flexibility: Column-free large-span design allows convenient layout adjustments and space utilization.
Eco-Friendly & Sustainable: Steel recycling rate over 90% with minimal construction waste, supporting green development.
Enhanced Anti-Corrosion: Digital coating line improves anti-corrosion performance by 5-10 years in harsh environments.
Proven Manufacturing Capacity: Monthly output of 6,000 tons with 8 professional lines and advanced processing equipment.
Comprehensive Quality Control: Strict pre-production sampling and final inspection ensure reliable product standards.

Company profile

Tiankai Southeast Green Building Technology (Henan) Co., Ltd.
R&D CapabilitiesCustomization from SamplesImporters and ExportersProduct Certification
Business Type: Manufacturer/FactoryExport Year: 2026-03-18Nearest Port: Tianjin PortAverage Response Time: ≤1.14hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW

About Our Factory & Business Background

Address500 meters south of the intersection of National Highway 310 and Industrial South Road in Xingyang City, Zhengzhou City, Henan Province
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Warehouse, Steel Structure Buildings, Metal-Faced Insulated Sandwich Panels, Sandwich Panels, Steel Sturcuure Workhop, Steel Structure Warehous Building, Color-Coated Steel

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty or after-sales service?
A:
We provide online guidance as our primary after-sales service support.
Q:What are the main steel grades available?
A:
We offer Q235, Q345, and ASTM A36 steel grades with yield strengths of 235 MPa and 345 MPa respectively.
Q:How is the structure connected?
A:
The steel structure buildings use bolt connections for efficient assembly and stability.
Q:What is the lead time for production?
A:
Peak season lead time is 1-3 months, while off-season lead time is within 15 workdays.
Q:What payment methods are accepted?
A:
We accept USD currency via T/T, LC, D/P, PayPal, Western Union, and Money Gram.

Send Inquiry

*To:Tiankai Southeast Green Building Technology (Henan) Co., Ltd.Tiankai Southeast Green Building Technology (Henan) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Versatile Steel Space Frame for Industrial Warehouse Construction
Made-in-China.com