SourcingAI
Try for free
Powered by Made-in-China.com
Large Span Steel Structure Warehouse with Insulated Panel Prefabricated Steel Warehouse
US$18.00-50.00
600 Square Meters

Product profile

Customization

Available

After-sales Service

Online Guidance

Connection Form

Bolt Connection

Model NO.

bwg

Construction Member

Steel Beam

Grade

Carbon Structural Steel

Molding Method

Cast Steel

Residential Wall Structure

Top Wall Beam

Standard

GB

Steel Type

High-Strength Steel

Structure

Frame Structure

Structural Performance Attributes

High Strength

Material Attributes

Good Weldability

Construction Attributes

Fast Construction Speed

Usage Function Attributes

Large Spatial Flexibility

Appearance and Modeling Attributes

Strong Modern Sense

Transport Package

Roro Ships, Barges or Vehicles with Special Loadin

Specification

Q345B / Q460C

Trademark

TKDN

Origin

Zhengzhou, Henan, China

HS Code

730890

Production Capacity

500, 000 T Per Year.

Key features

High Strength Steel: Utilizes Q235/Q345 steel with yield strength up to 345 MPa for superior load bearing.
Fast Construction Speed: Prefabricated components assembled on-site with intelligent welding robots 3-5x faster than manual work.
Large Span Flexibility: Achieves large-span column-free spaces with flexible layout adjustments for various industrial needs.
High Recycling Rate: Environmentally friendly with a steel recycling rate exceeding 90%, supporting green development.
Enhanced Durability: Automated digital coating improves anti-corrosion performance, extending service life by 5-10 years.
Seismic Safety: Excellent toughness and ductility ensure stability and safety during earthquakes and other disasters.
High Capacity Production: Monthly production capacity of 6,000 tons with 58 cranes and 8 professional production lines.

Company profile

Tiankai Southeast Green Building Technology (Henan) Co., Ltd.
R&D CapabilitiesCustomization from SamplesImporters and ExportersProduct Certification
Business Type: Manufacturer/FactoryExport Year: 2026-03-18Nearest Port: Tianjin PortAverage Response Time: ≤1.14hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW

About Our Factory & Business Background

Address500 meters south of the intersection of National Highway 310 and Industrial South Road in Xingyang City, Zhengzhou City, Henan Province
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Warehouse, Steel Structure Buildings, Metal-Faced Insulated Sandwich Panels, Sandwich Panels, Steel Sturcuure Workhop, Steel Structure Warehous Building, Color-Coated Steel

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
We provide a comprehensive 2-year warranty for all our mechanical equipment.
Q:What is the lead time for orders?
A:
Peak season lead time is 1-3 months, while off-season lead time is within 15 workdays.
Q:What payment methods are accepted?
A:
We accept T/T, LC, D/P, PayPal, Western Union, Money Gram, and small-amount payments.
Q:Can the steel structure be customized?
A:
Yes, we offer customization for structural performance, material attributes, and construction features.
Q:What is the minimum order quantity?
A:
Please contact our sales team for specific MOQ details as it varies by project requirements.

Send Inquiry

*To:Tiankai Southeast Green Building Technology (Henan) Co., Ltd.Tiankai Southeast Green Building Technology (Henan) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable Prefabricated Steel Warehouse with Easy Assembly Features
Made-in-China.com