SourcingAI
Try for free
Powered by Made-in-China.com
5V6a 8 Channel Cylindrical/Polymer Battery Testing Machine Tester Analyzer
US$950.00-1,100.00
1 set

Product profile

Customization

Available

After-sales Service

1 Year

Warranty

1 Year

Model NO.

TOB-CT4008-5V6A-S1

Application

Lithium-ion Battery

Customized

Customized

MOQ

1 Set

Transport Package

Standard Export Packing

Trademark

TOB

Origin

China

Key features

Wide Current Range: Supports 0.5mA to 6A per channel with parallel function for higher current.
Customizable Design: Customized equipment available with flexible MOQ of 1 Set.
Versatile Testing Modes: Supports CC, CV, CPC, CCD, CVD, CPD, CRD, and pulse charge/discharge.
Advanced Data Recording: Records data at 10Hz with 16-bit resolution and MySQL database support.
Comprehensive Protection: Features software and hardware protection including anti-reverse protection.
CE Certified Quality: Product holds CE certification ensuring safety and compliance standards.
Efficient Communication: Connects via Ethernet using TCP/IP protocol with EXCEL/TXT data output.

Company profile

XIAMEN TOB NEW ENERGY TECHNOLOGY CO., LTD.
High Repeat Buyers ChoicePatents AwardedYears of Export ExperienceImporters and Exporters
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2003-10-20 CertifiedNearest Port: Xiamen PortAverage Response Time: ≤5.04h CertifiedTerms of Payment: T/T CertifiedInternational Commercial Terms(Incoterms): FOB, EXW

AI-Powered supplier vetting

SummaryThe supplier is a China-based limited trading company established in 2012, with 30 employees and a stated focus including hydraulic coin cell crimping and laboratory rolling roll heat press machines. It reports in-stock service capacity, 3D software design, multiple customization options, CE certification, and regular fire drills. However, it reports no overseas warehouse, showroom, agents or branches, offline trade-show participation, popular-brand OEM, SDK, ODM, or new product development during the past year. Peak-season lead time is one month and off-season lead time is within 15 workdays. Service corrective-action and complaint-handling procedures lack written procedures or records, while quality assurance, traceability, and contract status are unclear. The available information does not substantiate customer cases or direct production capability.
CertificationsThe supplier reports sustainable-development and product certification capability through CE certification. The slices do not specify the certified products, certificate validity, or additional certifications.
After-Sales capabilityThe supplier reports in-stock service capacity and lead times of one month during peak season and within 15 workdays during the off-season. However, it has no overseas warehouse, agents, branches, or showrooms, and it lacks written procedures or records for corrective and preventive actions and customer complaint handling.
R&D capabilityThe supplier reports no available SDK, no ODM service, and no new products during the past year. It does provide 3D software design services and several forms of customization, but the evidence does not demonstrate ongoing product innovation.
Customization capabilityThe supplier reports 3D software design services and supports customization from samples, designs, minor customization, flexible customization, and full customization. This is explicit evidence of broad customization capability, although it does not include specific project examples.

Product Q&A

Q:What is the warranty period for this battery tester?
A:
The product comes with a 1-year warranty and includes after-sales service for 1 year.
Q:What is the minimum order quantity (MOQ)?
A:
The MOQ is 1 Set, as the product is customized.
Q:What types of batteries can this machine test?
A:
It tests polymer batteries, cylindrical batteries, super capacitors, Ni-MH batteries, and nickel-chromium batteries.
Q:What are the current and voltage ranges?
A:
Voltage range is 25mV to 5V. Current range is 0.5mA to 6A per channel, with options to parallel channels for higher current.
Q:What is the lead time for delivery?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:XIAMEN TOB NEW ENERGY TECHNOLOGY CO., LTD.XIAMEN TOB NEW ENERGY TECHNOLOGY CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like