SourcingAI
Try for free
Powered by Made-in-China.com
Small Copper Plating Machine with Portable Electroplating Barrel Small Electroplating Equipment Plating Machine Gold Plating Machine
US$700.00-5,000.00
1 set

Product profile

Customization

Available

After-sales Service

Supplied

Voltage

380V

Model NO.

TD-MB

Automatic Grade

Manual

Warranty

1 Year

Certification

CE

Key Word

Copper Plating Machine

Product Item

Metal Electroplating Machinery

Application

Surface Treatment

Plating Type

Barrel Palating / Hang Plating

Plating Style of Electroplating Line

Barrel Plating

Automatic Type

Manually Type

Operation

Manual Lifted up and Down

Machine Type

Full Automatic / Semi Automatic / Manually

Service

Lifelong Technology Support

Thickness of Tank

15 mm / Customized

Material of Tank

PP / PVC / Stainless Steel

Auxiliary Equipment

Chiller,Rectifier,Heating System

Size

Customized

Plating Process

Design According Customer's Plating Products

Manufacturer

Yes

Transport Package

Usually to Ba Packed in Plywood Box

Specification

Non-standard

Trademark

Tongda

Origin

China

HS Code

8543300090

Production Capacity

100 Sets/Month

Key features

Customizable Tank Thickness: Tank thickness is 15mm or customized to meet specific requirements.
Tailored Plating Process: Plating process is designed according to customer's specific plating products.
Anti-Corrosion Frame: Steel body with anti-corrosion and resistant epoxy painting for durability.
72-Hour Leak Testing: Tanks undergo 72-hour water filling testing before installation to ensure no leaks.
Comprehensive Accessories: Includes PP tank, barrel, hanger, rectifier, and optional auxiliary equipment.
Detailed Installation Guide: Provides a detailed manual before delivery for easy machine installation.
Flexible Shipping Options: Shipped by plywood or container directly with a lead time of 20-30 days.
CE Certified Quality: Machine holds CE certification ensuring compliance with safety standards.

Company profile

Junan Tongda Electronic Equipment Factory
Customization from DesignsQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤10.26h

About Our Factory & Business Background

AddressDadian Town, Junna County, Linyi City, Shandong Province, Linyi, Shandong, China
Plant Area5500 square meters
Number of Employees35
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners31

Our Production Capability & Technical Expertise

Main ProductsElectroplating Machine, Zinc Plating Machine, Chrome Plating Machine, Anodizing Machine, Nickel Copper Gold Tin Silver Plating, Brush Plating Machine, Waste Air Water Treatment System
Production Lines3
Production MachinesEngraving machine, Bending machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers3 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2024-11-13
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period for the machine?
A:
We provide a one-year warranty with free spare parts and full after-sale services.
Q:Can the machine be customized?
A:
Yes, the electroplating line is non-standard and designed according to your product information. Tank thickness and size are also customizable.
Q:What is the lead time for shipping?
A:
The lead time is 20-30 days. Peak season lead time is within 15 workdays or one month, and off-season is within 15 workdays or one month.
Q:What materials are used for the tank?
A:
The tank material is 15mm PP Plate or PVC, chosen for corrosion resistance.
Q:How is the machine tested before delivery?
A:
We perform anti-leakage testing by filling the tanks with water for 72 hours after welding and before installation.

Send Inquiry

*To:Junan Tongda Electronic Equipment FactoryJunan Tongda Electronic Equipment Factory
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like