SourcingAI
Try for free
Powered by Made-in-China.com
Tin Lead Electroplating Plating Anodes Copper Plating Solution Equipment for Tin Plating Machine
US$1,000.00-30,000.00
1 Set

Product profile

Customization

Available

After-sales Service

Yes

Voltage

380V

Model NO.

TD-H

Automatic Grade

Automatic

Warranty

1 Year

Certification

GS, CE, ISO

Control System

Portable , Pushing , Remote , PLC Programee

Equipment Mode

Portable , Manual,Semi-Automatic,Full-Automatic

Application

Metal , Ss , Brass , Iron , Aluminum Plating

Usage

Zinc , Nickel , Chrome , Anodizing , Copper

Pre-Treatment Step

Ultrasonic/Electronic/Heating Degreasing

Pre-Treatment Machine

Ultrasonic Clean Machine , Polishing Machine

Exteranl Equipment

Rectifier , Filter , Water Chiller

After-Treatment

Oven , Dry Machine

Rectifier

380V 50Hz , 3pH

Rectifier Spec

1000A 12V , 2000A 12V and etc.

Material

PP / PVC / Ss Plate

Crane Lifting

Electronic Hoist , Manual , Automatic

After-Service

Free Spare Parts, Field Installation

Transport Package

Plywood Package and Ocean Shipping

Specification

Customized

Trademark

TONGDA

Origin

Linyi China

HS Code

8543300090

Production Capacity

5-10 Sets Per Month

Key features

Customizable Control Systems: Options include Portable, Pushing, Remote, and PLC Programmer control systems.
Flexible Equipment Modes: Available in Portable, Manual, Semi-Automatic, and Full-Automatic modes.
Wide Application Range: Suitable for Zinc, Nickel, Chrome, Copper, Gold plating, and Anodizing.
Corrosion Resistant Materials: Constructed with 10-15mm PP/PVC plates and steel body with epoxy painting.
Comprehensive Warranty: 1-year warranty covering free replacement of external equipment excluding human damage.
Rigorous Pre-Delivery Testing: Includes 72-hour anti-leakage water testing and operational runing testing with video confirmation.
24/7 Multilingual Support: Online failure analysis and maintenance system available in 7 languages.
OEM and ODM Services: Full customization available from samples, designs, or specific customer needs.

Company profile

Junan Tongda Electronic Equipment Factory
Customization from DesignsQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressDadian Town, Junna County, Linyi City, Shandong Province, Linyi, Shandong, China
Plant Area5500 square meters
Number of Employees35
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners31

Our Production Capability & Technical Expertise

Main ProductsElectroplating Machine, Zinc Plating Machine, Chrome Plating Machine, Anodizing Machine, Nickel Copper Gold Tin Silver Plating, Brush Plating Machine, Waste Air Water Treatment System
Production Lines3
Production MachinesEngraving machine, Bending machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers3 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2024-11-13
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty. We will replace external equipment for free, except for damage caused by humans.
Q:Can the equipment be customized?
A:
Yes, the electroplating line is non-standard and designed according to your product information. We offer full customization from samples or designs.
Q:What control systems are available?
A:
We offer Portable, Pushing, Remote, and PLC Programmer control systems.
Q:How long is the lead time?
A:
The lead time is 30-35 working days.
Q:What testing is performed before delivery?
A:
We perform 72-hour anti-leakage testing by filling tanks with water and runing testing with video confirmation for the customer.

Send Inquiry

*To:Junan Tongda Electronic Equipment FactoryJunan Tongda Electronic Equipment Factory
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like