SourcingAI
Try for free
Powered by Made-in-China.com
Heavy-Duty G80 Master Link Assembly for Reliable Rigging Solutions
US$0.20-100.00
100 Pieces
Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

Material

Alloy Steel

Type

Master Link

Model NO.

TP-8-484

Usage

Industrial

Brand

Toplift

Condition

New

Color

Red

Grade

G80

Weight

1.43-101.3kg

Surface Finish

Powder Plastic

Dlivery Time

About 30 Days

Function

Lifting,Sling,Hoist

Transport Package

Carton or Wooden Box

Trademark

TOPLIFT or OEM

Origin

China

HS Code

73269090

Production Capacity

10000PCS/Month

Key features

High-Strength Alloy Steel: Made of super alloy steel, quenched and tempered for superior durability.
100% Quality Testing: Individually proof tested at MPF with 100% Magnaflux crack detection.
Wide Load Capacity: Available in weights from 1.43kg to 101.3kg with WLL up to 84.7T.
Customizable Options: Customizable grade, weight, and surface finish (Powder Plastic).
ISO Certified Factory: Manufactured in an ISO Quality Management System Certificated Factory.
10 Years Experience: Specializing in lifting equipment and rigging supply for around 10 years.
Fast Delivery: Delivery time about 30 days with support from a 3000 sqm workshop.
Professional Support: Over 20 professional staff in trading team for effective communication.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2012-05-21Nearest Port: Ningbo/ShanghaiAverage Response Time: ≤2.05hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, CIP, EXW, Others

AI-Powered supplier vetting

SummaryHANGZHOU TOP LIFT INDUSTRIES CO., LTD. is identified as a China-based manufacturer/factory in Hangzhou, Zhejiang, focused on lifting, rigging, safety, and related industrial products. It reports six production lines, 11–20 years of R&D engineer experience, 6–10 quality-control staff, export activity to multiple regions, and established export capability. The supplier lists ISO 9001, ASME, OHSAS/OHSMS 18001, and ANSI/ESD certifications, and states that it provides OEM services and after-sales support. Production lead time is reported as one month in off-peak periods and 2–3 months during peak periods. Trade records show three individual transactions associated with one Brazilian buyer in 2025, but these records provide limited evidence regarding broader customer coverage or long-term performance.
Supplier typeThe supplier is explicitly classified as a Manufacturer/Factory and its company nature is also recorded as a factory. It operates from Hangzhou, Zhejiang, China, with a stated factory location in the Xihu Industrial Zone.
CertificationsThe supplier lists OHSAS/OHSMS 18001, ANSI/ESD, ISO 9001, and ASME certifications. These stated certifications provide explicit evidence of formal management, safety, quality, and technical compliance systems, although the provided information does not include certificate validity dates or scope details.
After-Sales capabilityThe supplier states that its professional team provides outstanding pre-sales and after-sales service and support. This is a direct capability claim, but no service response metrics, service organization details, or verified customer evaluations are provided.
Production capacityThe supplier reports six production lines, 6–10 quality-control staff, and defined lead times of one month off-peak and 2–3 months during peak season. These figures explicitly demonstrate organized production capacity and stated delivery capability, although actual capacity utilization and fulfillment performance are not provided.
Customization capabilityThe supplier explicitly states that it provides OEM service and offers multiple quotation and payment terms, while also reporting self-operated import and export rights. OEM support directly indicates customization capability, although the available information does not specify customization scope, tooling, or minimum order requirements.

Product Q&A

Q:What is the material of the master link?
A:
It is made of super alloy steel that is quenched and tempered.
Q:How is the quality controlled?
A:
We use high-quality steel, standardize production, perform 100% finished product testing, and accept third-party inspections.
Q:What certifications does the factory have?
A:
The factory is ISO Quality Management System Certificated.
Q:What is the delivery time?
A:
The delivery time is about 30 days.
Q:What are the advantages of this product?
A:
We have 10 years of experience, offer the best price for same quality, timely delivery, numerous patents, and professional support.

Send Inquiry

*To:HANGZHOU TOP LIFT INDUSTRIES CO., LTD.HANGZHOU TOP LIFT INDUSTRIES CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Dawson G80 U. S. Type Forged Master Link Assembly
Made-in-China.com
G80 a-346 Master Link Assembly with Pressing Flat
Made-in-China.com
G80 Forged Master Link Assembly a-345 with Flat
Made-in-China.com