SourcingAI
Try for free
Powered by Made-in-China.com
High Efficiency FRP GRP Long Durable Cross Flow Water Chiller Cooling Tower
US$4,500.00-5,000.00
1 piece

Product profile

Customization

Available

Surface Treatment

Smooth

Color

Green

Model NO.

FRP Cooling Tower

Thickness

Customizable

Usage

Industral

Product Categories

Tower

Molding Method

Resin Transfer Molding

Material

FRP

Fiber Type

GFRP

Type

Polyester FRP

Treatment

Chemical Treatment

Certification

ISO, CE

Transport Package

Seaworthy

Trademark

TOP

Origin

China

HS Code

3925100000

Production Capacity

2000 Sets/Month

Key features

Durable FRP Material: Constructed from high-quality FRP and GFRP for long-lasting performance in industrial environments.
Customizable Thickness: Thickness can be customized to meet specific project requirements.
ISO 9001:2015 Certified: Manufacturing process strictly follows ISO 9001:2015 quality control standards.
OEM Service Available: Accepts all OEM orders with custom designs and reasonable pricing.
Versatile Industrial Use: Suitable for textile, chemical, sugar refinery, and steel plant applications.
Efficient Cooling Design: Counter flow design specifically suited for high-temperature cooling processes.
Fast Delivery Capability: Typically completes 20ft container orders within 30-35 days.
Multiple Payment Options: Supports T/T, L/C at sight, Western Union, and Alipay for flexible transactions.

Company profile

WEIFANG TOP NEW MATERIAL CO., LTD.
Importers and ExportersFast DeliveryQuality AssuranceHigh Repeat Buyers Choice
Business Type: Manufacturer/FactoryAverage Response Time: ≤7.06h

AI-Powered supplier vetting

SummaryWEIFANG TOP NEW MATERIAL CO., LTD. is identified as a Chinese manufacturer/factory in Shandong. The supplier reports OEM service for popular brands, ODM capability, and multiple customization options. Its described MDF operation has modern production, melamine covering, UV painting, and slatwall panel lines, with annual MDF output of about 80,000 CBM; a glass deep-processing factory is also described. However, the evidence shows no available SDK, no overseas agents or branches, no overseas warehouse or showroom, no in-stock capacity, and no participation in offline trade shows. Quality assurance is reported, but there are no written corrective-action or complaint-handling procedures and no raw-material traceability identification. Financial records are referenced only by year labels, without substantive performance details. Certification holdings, after-sales execution, and sustainability documentation are not sufficiently evidenced.
Supplier typeThe supplier is explicitly identified as a Manufacturer/Factory, legally organized as a Limited Company and located in Weifang, Shandong, China. This supports classification as a direct manufacturing supplier rather than only a trading or service entity.
After-Sales capabilityThe supplier reports no overseas agents or branches, overseas warehouse, overseas showroom, or in-stock service capacity. It also has no written corrective-action or customer-complaint handling procedures or records, indicating that effective after-sales capability is not demonstrated.
Production capacityThe MDF factory is described as having modern production, melamine covering, UV painting, and slatwall panel lines, with annual MDF output of about 80,000 CBM. A separate glass deep-processing factory with specialized equipment and technology is also reported, providing explicit evidence of manufacturing capability.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. This broad range indicates established flexibility in adapting products to customer requirements.

Product Q&A

Q:Are you a trading company or a manufacturing factory?
A:
We are both a manufacturer and a trading company. We have our own factory for almost seven years and provide better service for overseas customers.
Q:What is the delivery time?
A:
Delivery takes 60 days after receiving the deposit based on MOQ. Normally, it takes 30-35 days to finish an order for a 20ft container.
Q:How do you guarantee product quality?
A:
We strictly follow the ISO9001:2015 quality control system. Our professional QC team ensures every package undergoes final inspection according to QC instructions before packing.
Q:What are the payment terms?
A:
The basic payment terms are T/T and L/C at sight. We also accept Western Union and Alipay.
Q:Can you do OEM for me?
A:
Yes, we accept all OEM orders. Please contact us with your design, and we will offer a reasonable price as soon as possible.

Send Inquiry

*To:WEIFANG TOP NEW MATERIAL CO., LTD.WEIFANG TOP NEW MATERIAL CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Cross-Flow Low Noise 1500t Large Open FRP Cooling Tower
Made-in-China.com
250t Square Cross Flow FRP Industrial Cooling Tower
Made-in-China.com