Powered by Made-in-China.com
Standard HDG Galvanizing Ringlock Scaffolding Vertical Components
US$3.00-30.00
100 Pieces
Sample price:US$5.00/piece.Request sample
Product profile
Customization
AvailableMaterial
SteelType
All Rround /Ringlock ScaffoldingStructural Style
Tower ScaffoldingFramework
Combined ScaffoldingConstruction Properties
Building ScaffoldCertificate
ISO/SGS/CE/ANSI/as NzsRaw Material
Steel Q355b,Q235B,Q195Surface Finish
Hot DIP GalvanizedThickness
3.2mm/2.5mmConnect Method
Wedge/Ring LockOEM/ODM
AvailableTransport Package
PalletSpecification
Ringlock SystemTrademark
Total ContecOrigin
ChinaHS Code
730840Production Capacity
30000 Tons/YearKey features
High Load Capacity: Designed to support heavy loads for temporary structures in various projects.
Wide Application Scope: Suitable for building, bridge, viaduct, and petrochemical construction industries.
Certified Quality: Holds ISO 9001, CE, SGS, ANSI, and AS/NZS certifications for safety and compliance.
Customization Available: Professional team offers customized design solutions and OEM/ODM services.
Fast Delivery: 10-15 days after deposit for standard orders; 2 days if stock is available.
Large Production Capacity: Combined annual output of 50,000 tons from two factories in Jiangsu and Hebei.
Flexible Payment Terms: Accepts T/T and L/C; offers 30-45 days credit for qualified quality customers.
Sample Testing Support: Provides samples for testing before placing batch orders to ensure quality.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableAverage Response Time: ≤1.11h
AI-Powered supplier vetting
SummaryWUXI TOTAL CONTEC METAL INDUSTRIES CO., LTD. is a China-based limited company identified as both a trading company and manufacturer/factory, supplying scaffolding, construction materials, and construction equipment. It reports more than 20 years of international trade experience, in-stock service capability, 14 qualified service-capable suppliers, and average lead times within 15 workdays in both off-season and peak season. The supplier provides OEM and ODM services and launched new products during the past year, but reports no SDK, overseas warehouse, showroom, overseas agent or branch, and no participation in offline trade shows. Service procedures and complaint-handling records are available, while several quality-control and sustainability indicators remain unknown. The available audit record was conducted by BV, but the stated audit evaluation result is 0. Financial records are identified for multiple years, but the provided slices do not establish financial strength.
Supplier typeThe supplier is explicitly identified as both a trading company and manufacturer/factory, with a limited-company structure in Jiangsu, China. Its stated primary products are scaffolding, construction materials, and construction equipment.
After-Sales capabilityThe supplier has a clear customer-complaint procedure with followed records, corrective and preventive action procedures with records, in-stock service capability, and average lead times within 15 workdays in both seasons. However, it has no overseas warehouse, showroom, overseas agent or branch, and offers overseas services in 0 countries, limiting evidence of localized after-sales support.
R&D capabilityThe supplier reports new products during the past year and provides ODM services, with one R&D engineer responsible for AutoCAD design drawings. Its lack of an available SDK and the limited stated R&D staffing indicate some constraints, but the reported product-development activity is positive evidence.
Production capacityThe supplier identifies itself as a manufacturer/factory and supplies construction-related products, with in-stock capability and average lead times within 15 workdays during both off-season and peak season. Nevertheless, the slices do not provide production capacity, equipment, workforce, or output figures.
Customization capabilityThe supplier explicitly provides ODM services, OEM services for popular brands, and product-design support through AutoCAD drawings. These statements directly support its ability to undertake customized product or branding requirements.
Product Q&A
Q:Are you a trading company or manufacturer?
A:
We are a manufacturer with two factories located in Jiangsu and Hebei Province.
Q:What is the delivery time?
A:
It takes 10-15 days after receiving the deposit for a 40FT container. If stock is available, we can send out products within 2 days.
Q:What is your production capacity?
A:
The Jiangsu factory produces 20,000 tons per year, and the Hebei factory produces 30,000 tons per year.
Q:What certificates do you have?
A:
We hold ISO 9001, ISO14001, OHSAS 18001, CE, SGS, ANSI, and AS/NZS certificates.
Q:Can you do customized design?
A:
Yes, our professional technical team will offer you a perfect customized solution.
Send Inquiry
*To:
WUXI TOTAL CONTEC METAL INDUSTRIES CO.,LTD
WUXI TOTAL CONTEC METAL INDUSTRIES CO.,LTD*Content:
Supplier replies will be sent to your registered email
You may also like
British Standard Steel Ringlock System Scaffold Brace Bracket Plank Components of Scaffolding
US$56.00-198.00
1 Piece(MOQ)
Prefabricated Ringlock Scaffolding Components Standard Ledger Diagonal
US$800.00-1,400.00
20 Tons(MOQ)
Steel Ringlock Scaffolding Components (FF-007)
US$0.90-2.90
1,000 Pieces(MOQ)
SGS Tested Ledger Frame Scaffold Ringlock Scaffolding Components
US$3.00-20.00
100 Pieces(MOQ)
Q235 Steel Heavy Duty Hot-DIP Galvanized Scaffold Ledger, AS/NZS 1576 Standard Kwikstage System Component
US$15.00-20.00
1,000 Pieces(MOQ)
Durable Ringlock Scaffolding System Components at Competitive Prices
US$1.00-15.00
1,000 Pieces(MOQ)
High Quality Layer All Round Metal China Ring Lock Scaffolding Components for Sale
US$0.10-30.00
1 Piece(MOQ)
Painted Steel Kwikstage System Scaffolding Components for Australia Construction
US$2.80-15.90
500 Pieces(MOQ)
Premium Galvanized Ringlock Scaffolding Components for Global Construction Projects
US$3.50-8.50
500 Pieces(MOQ)
Premium Ringlock Scaffolding Brace Components for Construction Projects
US$1.00-15.00
1,000 Pieces(MOQ)
Quick Stage Scaffold Components
US$1,100.00-1,200.00
5 Tons(MOQ)
Africa Kwikstage Scaffold Components
US$1,100.00-1,200.00
5 Tons(MOQ)
Building Scaffolding for Sale a Scaffolding Plank Frame Scaffold Components
US$79.00-90.00
1 Piece(MOQ)
Wholesale Layher System Scaffolding Parts/Components for Construction Building Hardware
US$3.00-20.00
100 Pieces(MOQ)
Construction Cuplock Scaffold Accessories Bottom Cup Cuplock Scaffolding Cuplock Components
US$360.00-480.00
1 Set(MOQ)
Hot Dipped Galvanized Scaffold Components
US$5.00-55.00
500 Pieces(MOQ)
Innovative Scaffolding System Featuring Heavy Duty Ringlock Components
US$700.00-900.00
25 Tons(MOQ)
Accessories Scaffold Components Saffolding Diagonals
US$3.00-20.00
100 Pieces(MOQ)
Heavy Duty Cone Scaffolding Components
US$10.00-20.00
100 Pieces(MOQ)



















