SourcingAI
Try for free
Powered by Made-in-China.com
2000kVA Step Down Transformer for Diverse Applications
US$2,500.00
1-999 Pieces
US$1,500.00
1,000+ Pieces

Product profile

Customization

Available

Application

Power, High-Rise Buildings, Factory, Hydropower Station

Phase

Three

Model NO.

SCB18

Core

Core-type Transformer

Cooling Method

Dry-type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001, CCC, ISO9001-4000,CE

Usage

Power Transformer, Distribution Transformer, Three Phase Transformer

Frequency Characteristics

Power Frequency

Shape of Core

Ring

Brand

Tianrun

Rated Capacity

2000kVA(Customized)

Primary Voltage

22kv(Customized)

Secondary Voltage

0.4kv(Customized)

Joni Group Label

Dyn11 Yyn0(Customized)

Cooling

an/Af

Insulation Tempareture Resistance Grade

Grade F or Above

Core Material

Silicon Steel

Winding

Copper/Aluminum

Transport Package

Wooden Case

Specification

1800*1300*1900mm

Trademark

TRNE

Origin

China

HS Code

8504329000

Production Capacity

500 Sets Per Month

Key features

Customizable Rated Capacity: Rated capacity is customizable to meet specific project needs.
Customizable Voltage: Primary and secondary voltages are fully customizable.
Low Loss Core Design: Optimized 3D magnetic-circuit simulation reduces no-load loss.
Flame Retardant & Oil-Free: Features explosion-proof performance with zero flammable media.
Global Standardized Design: Interchangeable accessories simplify installation and maintenance.
High Shock Resistance: Improved shock resistance and low partial discharge capability.
Grade F Insulation: Insulation temperature resistance grade is F or above.
OEM/ODM Services: Full customization available from samples or designs.

Company profile

Zhejiang Tianrun Electric Co., Ltd.
Importers and ExportersFull Customization100% Finished Products InspectionR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.29h

About Our Factory & Business Background

AddressNo. 788 Wenyi Road, Bihu Industrial Park, Liandu District, Lishui, Zhejiang, China
Plant Area50369.12 square meters
Number of Employees167
Registered Capital107,580,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners80

Our Production Capability & Technical Expertise

Main ProductsTransformer Switchgear Substation
Production Lines2
Production MachinesPunching machine, Laser cutting machine, CNC bending machine, Winding machine, Drying machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers7 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2003-12-05
Main MarketsDomestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff1
Overseas Agent/BranchYes
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:Is the transformer capacity customizable?
A:
Yes, the rated capacity is customizable to suit specific project requirements.
Q:What are the available voltage options?
A:
The primary voltage (22kV) and secondary voltage (0.4kV) can be customized.
Q:Can you provide OEM or ODM services?
A:
Yes, we offer full customization, minor customization, and customization from samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 unit.
Q:What is the lead time for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Zhejiang Tianrun Electric Co., Ltd.Zhejiang Tianrun Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Voltage Step Down Transformer for Diverse Applications
Made-in-China.com
2000kVA Step Down Transformer for Versatile Power Needs
Made-in-China.com