SourcingAI
Try for free
Powered by Made-in-China.com
Durable Three Phase Oil-Immersed Transformer for Industrial Power Needs
US$3,000.00
1-9 Pieces
US$1,000.00
10+ Pieces

Product profile

Customization

Available

Application

Power, Lighting, Combined Transformer, Power Transformer,

Phase

Three

Model NO.

S13

Core

Core-type Transformer

Cooling Method

Oil-immersed Type Transformer

Winding Type

Multi-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC, CE

Usage

Power Transformer, Distribution Transformer, Three Phase Transformer

Frequency Characteristics

Power Frequency

Shape of Core

Ring

Brand

Tianrun

Rated Frequency

50/60Hz

Rated Voltage/Hv

11/22/33kv

Rated Voltage/LV

400V

Transformer Capacity

30-2500kVA

Vector Group

Yyn0/Dyn11

Winding

Copper/Aluminum

Transport Package

Wooden Case

Specification

1400*1200*1800mm

Trademark

TRNE

Origin

China

HS Code

8504109000

Production Capacity

1000/Monthly

Key features

Advanced Energy Efficiency: No-load losses reduced by 37% and noise decreased by 20% compared to national standards.
Full Customization Support: Customizable rated capacity, voltage, connection group, and cooling method based on needs.
Wide Capacity Range: Available transformer capacities from 30kVA to 2500kVA for diverse power needs.
Superior Temperature Control: Optimized winding heat dissipation ensures stable continuous operation without overheating.
Low Noise Operation: Precision step-lamination technology suppresses vibration for quiet performance.
International Compliance: Meets IEC and GB1094 standards with strict routine and type testing.
100% Quality Inspection: Every unit undergoes insulation, loss, and leak tests before shipment.
Flexible Lead Time: Off-season delivery within 15 workdays; peak season within one month.

Company profile

Zhejiang Tianrun Electric Co., Ltd.
Importers and ExportersFull Customization100% Finished Products InspectionR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤0.20h

About Our Factory & Business Background

AddressNo. 788 Wenyi Road, Bihu Industrial Park, Liandu District, Lishui, Zhejiang, China
Plant Area50369.12 square meters
Number of Employees167
Registered Capital107,580,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners80

Our Production Capability & Technical Expertise

Main ProductsTransformer Switchgear Substation
Production Lines2
Production MachinesPunching machine, Laser cutting machine, CNC bending machine, Winding machine, Drying machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers7 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2003-12-05
Main MarketsDomestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff1
Overseas Agent/BranchYes
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:What is the capacity range of this transformer?
A:
The transformer is available in a wide range from 30kVA to 2500kVA.
Q:How does this model compare to the S11 transformer?
A:
The S13-M reduces average no-load loss by 37% and noise by 20% compared to the S11 model.
Q:Is customization available for this product?
A:
Yes, we support full customization for rated capacity, voltage level, connection group, and cooling method.
Q:What standards does this transformer comply with?
A:
It complies with international IEC standards and national GB1094 standards.
Q:What is the lead time for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Zhejiang Tianrun Electric Co., Ltd.Zhejiang Tianrun Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Efficiency Oil Immersed Three Phase Power Transformer
Made-in-China.com