All-in-one Integrated Design: Combine shaker, desander, desilter & degasser to finish multi-stage mud purification in one unit.
Closed Circulation Treatment: Realize drilling fluid recycling to cut fresh mud preparation workload greatly.
Centralized Control Panel: Unified operation for all equipment, convenient parameter adjustment onsite.
Save Site Space: Replace scattered separate machines to avoid messy layout on narrow drilling rig.
Lower Installation Cost: Pre-assembled in factory, skip complicated separate piping connection work.
Reduce Labor Cost: One operator can run whole set instead of multiple workers for single devices.
35% Less Floor Space: Compact layout saves over one third rig occupation versus discrete equipment.
40% Faster Setup: Pre-installed pipeline cuts field assembly time from 7 days to under 3 days.
Land Drilling Rig Application: Perfect for conventional onshore oil & gas well drilling mud cleaning.
HDD Trenchless Project: Small footprint fits limited space of horizontal directional construction site.