Powered by Made-in-China.com
Fixed Scaffolding Coupler Scaffolding Clamp Drop Forged Double Coupler for Sale
US$2.00
1,000-4,999 Pieces
US$1.00
5,000-9,999 Pieces
US$0.75
10,000+ Pieces
Sample price:US$50.00/set.Request sample
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
GalvanizedMaterial
SteelColor
CustomizationSurface Treatment
Galvanizd/PaintedCertificate
CE/SGSPacking
Bundle or Bulk as RequiredMOQ
1000piecesProduction Time
7 Working DaysAppication
Construction BulidingModel Number
Scaffolding Putlog ClampScaffolding Part Type
Scaffolding CouplersStyle
Japanese. British, German, AmericanSurface
Self-Color, Zinc Plated, Hot DIP GalvanizedTransport Package
Steel Tape BracketOrigin
ChinaHS Code
7308400000Production Capacity
5000pieces/MonthKey features
Customizable Sizes: Various regular sizes available with custom size options for scaffolding couplers.
Color Customization: Full color requirements met for powder coated surfaces including self-color and zinc plated.
Quality Inspection: Inspection service provided before loading with support for inspection reports.
Durable Material: Constructed from Q235/Q345 steel with galvanized finish for enhanced durability.
Efficient Construction: Saves 60% time and manpower compared to traditional scaffolding methods.
Certified Quality: Company holds CE and SGS certifications ensuring international standards.
Fast Delivery: 7 working days delivery time for stock materials to meet urgent requirements.
Global Experience: Over 15 years experience with business spread across 50+ countries and areas.
Company profile
Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2015-10-01Nearest Port: tianjinAverage Response Time: ≤3.17hTerms of Payment: T/T, PayPal, Small-amount paymentInternational Commercial Terms(Incoterms): FOB, EXW, CIF, DDP, FCA
About Our Factory & Business Background
AddressNo. 505, Building 6, Area D, Tianfu Software Park, No. 599 Century City South Road, High-tech Zone Area, Chengdu
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Steel Prop, Scaffolding Frame, Ringlock Scaffolding, Scaffolding Coupler, Steel Plank, Formwork Tie Rod Wing Nut, Steel Formwork, Plastic Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Mid East, Eastern Asia
Product Q&A
Q:Are you a manufacturer?
A:
Yes, we have specialized in this field for about 15 years experience.
Q:Could you provide sample?
A:
Yes, we can provide sample together with our catalogue.
Q:What information should I provide if I want a lowest quotation?
A:
The specifications of wire diameter, length, quantity, packing, etc.
Q:How does your factory do regarding quality control?
A:
We use the best raw material, have at least 5 years experienced workers, the advanced machine and specialized team to assure the quality. We perform Quality Control Inspections on 100% of our products.
Q:How is your delivery time?
A:
We always prepare enough stock material for your urgent requirement. The delivery time is 7 days for all the stock material. We will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Send Inquiry
*To:
Sichuan Taishenglan Technology Co., Ltd
Sichuan Taishenglan Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Building Material Q235 Steel Double Coupler Scaffolding Clamp and Scaffold Clip Drop Forged Swivel Coupler
US$0.05-0.10
10,000 Pieces(MOQ)
Hot DIP Galvanized Drop Forged Swivel Scaffolding Coupler for 48.3mm Steel Tubes
US$2.50-3.00
1,000 Pieces(MOQ)
En 74 BS1139 Pressed/Forged Fixed Forged Swivel Pipe Scaffolding Coupler
US$1.50-6.50
20 Tons(MOQ)
High Quality Q235 Steel Scaffolding Beam Clamp En 74 Standard Drop Forged Girder Coupler
US$0.05-0.08
1,000 Pieces(MOQ)
Made-in China Price Scaffold Pipe Fitting Scaffolding Accessories Drop Forged Retaining Girder Coupler
US$2.06-2.13
1,000 Pieces(MOQ)
Construction Pressed Scaffolding Double Clamp Coupler for Sale
US$0.40-0.60
1,000 Pieces(MOQ)
Heavy Duty Drop Forged Sleeve Couplers Corrosion Resistant Scaffolding Pipe Joints Sheet Metal Clamps for Construction
US$0.067-0.098
1,000 Pieces(MOQ)
Premium BS1139 Drop Forged Right Angle Coupler for Scaffolding
US$1.23-1.53
500 Pieces(MOQ)
Forged Steel Double Swivel Putlog Girder Clamp Scaffolding Coupler Sleeve Ladder
US$0.80-0.99
1,000 Pieces(MOQ)
Scaffolding System/Frame/ Ringlock/Cuplock/Scaffold Toe Board Clamp/Board Retaining Scaffolding Coupler
US$1.00-1.20
2,000 Pieces(MOQ)
British Scaffolding Double Coupler Scaffolding Pipe Parts Clamp Forged Scaffold Tube Forged Scaffolding Tube Coupler
US$0.75-2.00
1,000 Pieces(MOQ)
OEM Drop Forged Fix Rigid Beam Scaffolding Clamp Swivel Coupler for Building
US$0.69-3.99
100 Pieces(MOQ)
OEM Scaffolding Double Fixed Cross Clamp Coupler
US$0.10-0.50
50 Pieces(MOQ)
Pressed Scaffold Fixed Scaffolding Forged Swivel Pipe Tube Coupler Forged Scaffolding Tube Coupler
US$0.75-2.00
1,000 Pieces(MOQ)



















