Powered by Made-in-China.com
Formwork Steel Prop Nut Scaffolding Construction Drop Forged Galvanized Formwork Tie Rod Nut
US$1.20
1,000-4,999 Pieces
US$0.90
5,000-9,999 Pieces
US$0.50
10,000+ Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
3yearCertification
CEMaterial
SteelType
Wall FormworkColor
CustomizationCertificate
CE/SGSPacking
Bundle or Bulk as RequiredMOQ
1000PCSProduction Time
7 Working DaysAppication
Construction BulidingModel Number
Concrete SiteStyle
ModerSize
Round Shape: 90mm, 100mm, Square Shape: 112*112mmTransport Package
Steel Tape BracketOrigin
ChinaProduction Capacity
500000pieces/MonthKey features
Customizable Design: Over 50 designs available; custom development supported via samples or drawings.
CE & SGS Certified: Products certified by CE and SGS, ensuring compliance with international standards.
Fast Delivery: 7 working days delivery for stock materials; urgent requirements supported.
100% Quality Control: Strict quality inspections on 100% of products using advanced machinery and experienced workers.
15 Years Experience: Specialized manufacturer with over 15 years of production and 10 years of export experience.
Multiple Material Options: Available in Q235 steel and Aluminium Alloy with galvanized or zinc-plated finishes.
Global Reach: Business spreads over 50 countries and areas with a strong international presence.
Flexible Packaging: Professional, environmentally friendly packaging in bundles or bulk as required.
Company profile
Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2015-10-01Nearest Port: tianjinAverage Response Time: ≤3.71hTerms of Payment: T/T, PayPal, Small-amount paymentInternational Commercial Terms(Incoterms): FOB, EXW, CIF, DDP, FCA
About Our Factory & Business Background
AddressNo. 505, Building 6, Area D, Tianfu Software Park, No. 599 Century City South Road, High-tech Zone Area, Chengdu
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Steel Prop, Scaffolding Frame, Ringlock Scaffolding, Scaffolding Coupler, Steel Plank, Formwork Tie Rod Wing Nut, Steel Formwork, Plastic Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Mid East, Eastern Asia
Product Q&A
Q:Are you a manufacturer?
A:
Yes, we have specialized in this field for about 15 years experience.
Q:Could you provide sample?
A:
Yes, we can provide sample together with our catalogue.
Q:What information should I provide if I want a lowest quotation?
A:
The specifications of wire diameter, length, quantity, packing, etc.
Q:How does your factory do regarding quality control?
A:
We are very proud to let you know that, we use the best raw material, have at least 5 years experienced workers, the advanced machine and specialized team to assure the quality. We perform Quality Control Inspections on 100% of our products.
Q:How is your delivery time?
A:
We always prepare enough stock material for your urgent requirement. The delivery time is 7 days for all the stock material. We will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Send Inquiry
*To:
Sichuan Taishenglan Technology Co., Ltd
Sichuan Taishenglan Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Forged Super Plate 15.0 for Doka Facade Formwork Combi Nut
US$1.70-4.00
1,000 Pieces(MOQ)
Ductile Iron Casting Wing Nut Galvanized for Formwork Tie Bar
US$0.51-1.16
500 Pieces(MOQ)
China Formwork System Formwork Nut 15*17mm 1-6m Scaffolding Construction Drop Forged Galvanized Formwork Tie Nut
US$0.50-1.20
1,000 Pieces(MOQ)
Premium Formwork Accessories Tie Rod Nut for Construction Professionals
US$0.50-0.80
3,000 Pieces(MOQ)
Galvanized Casted15/17mm Combi Plate Nut for Formwork Tie Rod System
US$1.39-3.99
1,000 Pieces(MOQ)
Formwork Accessories Tie Rod Water Stop Nut Scaffolding Wing Nut Scaffold Tie Rod and Nut
US$0.50-1.20
1,000 Pieces(MOQ)
Long-Lasting Tie Rod Nut for Heavy-Duty Formwork Construction
US$0.50-0.80
3,000 Pieces(MOQ)
Long Hex Nut Formwork Connector Galvanized Surface 50mm Length for Tie Bar
US$0.51-1.16
500 Pieces(MOQ)
100mm Forged Steel Flange Nut for Construction Shuttering Tie Rod Bar
US$0.90-4.00
1,000 Pieces(MOQ)
Forged High Strength Square Plate Wing Nut for Concrete Formwork Construction
US$0.70-1.20
2,000 Pieces(MOQ)
Customized Formwork Wing Nut Construction Wing Tie Rod Wing Nut Formwork Accessoires Tie Rod Wing Nut
US$0.50-1.20
1,000 Pieces(MOQ)
Formwork Accessories Casted Wing Nut Tie Nut D70 for Steel Tie Rod D17
US$0.39-1.09
1,000 Pieces(MOQ)
Formwork Wing Nut Tie Rod Water Stop Nut Formwork Scaffolding Accessories
US$0.50-1.20
1,000 Pieces(MOQ)
Drop or Casting 17mm Formwork Swivel Base Plate Combine Nut for Concrete Formwork
US$0.99-1.99
1,000 Pieces(MOQ)
Standard Size Formwork Tie Rod Combination Nut with Plate for Shuttering Work
US$0.51-1.25
2,000 Pieces(MOQ)
Building Construction Concrete Steel Formwork/Rebar Forged Wing Nut
US$0.20-0.40
500 Pieces(MOQ)
15/17mm Scaffolding Casting Anchor Nut Concrete Formwork Accessories-Wing Nut with Threaded Tie Rod
US$0.49-1.99
1,000 Pieces(MOQ)
Aluminum Formwork System Tie Rod Nut D12 Quick Release Type
US$0.50-0.80
50 Pieces(MOQ)



















