Powered by Made-in-China.com
1 2 3 4 5 6m Steel Round Tube for Scaffold Construction
US$900.00-1,200.00
10 Tons
Product profile
Customization
AvailableAfter-sales Service
24 Hours Full Time ServiceWarranty
One YearModel NO.
scaffolding tubeMaterial
SteelType
FixedStructural Style
Scaffolding PipeFramework
Spanish Type, Italian Type, Middle East TypeSupporting Mode
Projecting ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding TubeConstruction Properties
Building ScaffoldName
Scaffolding Steel TubeRaw Material
Q195/Q235/Q355 SteelMOQ
5tonLength
1m 2m 3m 4m 5m 6mTransport Package
by BundleSpecification
48.3*3*6000Trademark
WufangOrigin
ChinaHS Code
7308400000Production Capacity
10000 Tons/MonthKey features
Customizable Length: Length can be customized from 1 to 8 meters to meet specific project needs.
Hot Galvanized Material: Made from high-grade Q235 hot galvanized steel for superior durability and corrosion resistance.
Multi-Standard Compliance: Meets BS1139 and EN74 standards with SGS, ISO, BV, CE, and CQC certifications.
Flexible Jointing: Can be jointed at any angle with the right coupler for versatile scaffolding configurations.
Comprehensive Warranty: Backed by a one-year warranty and a 20-year quality guarantee.
24/7 Technical Support: Full-time service available 24 hours a day for all customer inquiries.
OEM Service Accepted: OEM services available for custom designs and requirements.
Free Plastic Caps: Plastic caps for both ends of tubes can be provided free of charge.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.88h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with 110 employees and no stated parent-group affiliation. It manufactures and sells metal structures and related products, including ring-lock and frame scaffolding, tubes and connectors, support props, steel formwork, aluminum towers, LVL plates, and steel wire. Evidence indicates substantial stated production capacity, documented inspection procedures, customization and ODM services, and new product activity in the past year. Service processes include corrective and preventive actions, complaint handling, supplier assessment, and quality assurance records. However, the supplier reports no overseas warehouse, showroom, agent or branch, and no offline trade-show participation. Financial records are referenced for 2021–2023, but no financial performance details are provided. No certifications or customer case details are stated.
Supplier typeThe supplier is identified as a limited company, classified as a combined company, and not part of a larger company group. Its stated business scope includes metal-structure manufacturing and sales, while its product range centers on scaffolding, formwork, supports, and related construction products.
After-Sales capabilityThe supplier has documented corrective and preventive action procedures, customer complaint-handling procedures, quality assurance records, and written supplier-service assessment procedures. It offers training and has in-stock capability, but reports no overseas warehouse, showroom, agent, or branch and serves zero stated overseas countries, which limits demonstrated overseas after-sales coverage.
R&D capabilityThe supplier reports new products during the past year, provides ODM services, and supports customization from samples and designs. It does not have an available SDK, but the stated product-development and ODM evidence supports innovation capability for physical products.
Production capacityStated annual capacity includes 150,000 tons of ring-lock scaffolding, 150,000 sets of frame scaffolding, 500,000 sets of shoring props, and 12,000 tons of steel formwork; production-related equipment includes punch presses and cutting machines. The supplier also reports valid contracts with each related subcontractor, inventory capability, standardized finished-product inspection instructions, and one-month average lead times in both peak and off-season.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, and minor customization. It also provides ODM services, indicating capability beyond standard-product supply.
Client casesThe supplier states that it provides OEM services for well-known brands, which is evidence of brand-related customer experience. However, no customer names, project details, order history, references, or independently verifiable case descriptions are provided.
Product Q&A
Q:Are you a factory or a trader?
A:
We are a factory with more than ten years of manufacturing experience.
Q:What is your delivery time?
A:
Delivery time is about 10 to 20 days after receiving the deposit.
Q:What are your payment modes and sample policies?
A:
Payment is normally by T/T and L/C, which is negotiable. Samples are available.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 25 metric tons.
Q:Can the tube length be customized?
A:
Yes, the length can be customized from 1 to 8 meters.
Send Inquiry
*To:
Tangshan Wufang Industry Co., Ltd.
Tangshan Wufang Industry Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Hot Galvanized Steel Round Tube for Scaffold Construction Brazil
US$900.00-1,200.00
10 Tons(MOQ)
Easy Hot DIP Galvanized Round Scaffold Steel Tube for Building Support
US$14.28-14.53
1,000 Pieces(MOQ)
BS1139 En39 48.3mm Galvanized Scaffolding 1/2 3/4 1"2"1.5"Inch Hot Dipped Gi Pipe Pre Galvanized Steel Tube
US$9.80-14.80
800 Pieces(MOQ)
Easy Galvanized Building Scaffold 48.3mm Round Steel Tube for Southeast Asia
US$14.28-14.53
1,000 Pieces(MOQ)
Galvanized Round Steel Scaffold Pipe Anti Corrosion Metal Tube for Construction
US$7.80-12.00
1,000 Pieces(MOQ)
Easy Scaffolding Galvanized Steel Round Tube 48.3mm Diameter 6m Scaffold Steel Tube
US$9.60-10.00
500 Pieces(MOQ)
Galvanized Round Steel Gi Pipe Tube for Construction
US$1,030.00
25 Pieces(MOQ)
Q235 Steel Gi Pipe BS1139 ERW Black Pipe Scaffolding Round Tube Square Tube Seamless Tube for Building Work
US$700.00-1,000.00
1 Ton(MOQ)
Hot DIP Galvanized Round Steel En74 6m Scaffolding Tube
US$9.80-14.80
800 Pieces(MOQ)
BS1139 Galvanized Steel Pipe Scaffolding Round Hot Dipped Tubes for Building Factory
US$9.80-14.80
800 Pieces(MOQ)
Premium Round Steel Tube for Industrial and Commercial Applications
US$900.00-1,200.00
10 Tons(MOQ)
Galvanized Steel Pipes Scaffolding Round Hot Dipped Gi Tube for Building
US$0.95-1.10
1 kg(MOQ)
Construction Scaffolding Steel Tube for Warehouse Factory Maintenance Steel Pipe for Working Platform Scaffold Accessories
US$14.28-14.53
1,000 Pieces(MOQ)
Easy Round Scaffold Steel Pipe 48.3mm Galvanized En39 Construction Tube
US$14.28-14.53
1,000 Pieces(MOQ)
Easy Pre Galvanized 25mm 6m Scaffolding Round Pipe Tubes Square
US$500.00-1,100.00
10 Tons(MOQ)



















