Powered by Made-in-China.com
BS1139 Pipe Clamp Galvanized Scaffolding Connectors Fittings and Tubes
US$900.00-1,200.00
10 Tons
Product profile
Customization
AvailableAfter-sales Service
1 YearWarranty
1 YearModel NO.
SCAFFOLDING TUBEMaterial
SteelType
FixedStructural Style
Tower ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
High FormworkErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Building ScaffoldColor
Sliver,BlackSteel Material
Q355,Q235,Q195Transport Package
by BundleSpecification
48.3mm, 48.6mm, 60.3mmTrademark
WufangOrigin
ChinaHS Code
7308400000Production Capacity
10000 Tons/MonthKey features
BS1139/EN74 Standard: Complies with BS1139/EN74 standards with SGS, ISO, BV, CE, CQC certificates.
Customizable Length: Tube length can be customized from 1 to 8 meters according to customer requirements.
Flexible Jointing: Scaffolding pipes can be jointed together at any angle with the right coupler.
Hot Galvanized Steel: Made of hot galvanized steel tube, grade Q235, ensuring durability and corrosion resistance.
OEM Service Available: OEM accepted with customization options from samples, designs, or full customization.
Wide Application: Suitable for construction, real estate, outside masonry, and inside concrete support.
Professional Manufacturer: Factory with over 10 years history, 500+ employees, and 20-year guarantee.
Secure Packaging: Packed in bundles of 61 or 91 pieces with steel strips, plastic caps available.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.41h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with 110 employees and no stated parent-group affiliation. It manufactures and sells metal structures and related products, including ring-lock and frame scaffolding, tubes and connectors, support props, steel formwork, aluminum towers, LVL plates, and steel wire. Evidence indicates substantial stated production capacity, documented inspection procedures, customization and ODM services, and new product activity in the past year. Service processes include corrective and preventive actions, complaint handling, supplier assessment, and quality assurance records. However, the supplier reports no overseas warehouse, showroom, agent or branch, and no offline trade-show participation. Financial records are referenced for 2021–2023, but no financial performance details are provided. No certifications or customer case details are stated.
Supplier typeThe supplier is identified as a limited company, classified as a combined company, and not part of a larger company group. Its stated business scope includes metal-structure manufacturing and sales, while its product range centers on scaffolding, formwork, supports, and related construction products.
After-Sales capabilityThe supplier has documented corrective and preventive action procedures, customer complaint-handling procedures, quality assurance records, and written supplier-service assessment procedures. It offers training and has in-stock capability, but reports no overseas warehouse, showroom, agent, or branch and serves zero stated overseas countries, which limits demonstrated overseas after-sales coverage.
R&D capabilityThe supplier reports new products during the past year, provides ODM services, and supports customization from samples and designs. It does not have an available SDK, but the stated product-development and ODM evidence supports innovation capability for physical products.
Production capacityStated annual capacity includes 150,000 tons of ring-lock scaffolding, 150,000 sets of frame scaffolding, 500,000 sets of shoring props, and 12,000 tons of steel formwork; production-related equipment includes punch presses and cutting machines. The supplier also reports valid contracts with each related subcontractor, inventory capability, standardized finished-product inspection instructions, and one-month average lead times in both peak and off-season.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, and minor customization. It also provides ODM services, indicating capability beyond standard-product supply.
Client casesThe supplier states that it provides OEM services for well-known brands, which is evidence of brand-related customer experience. However, no customer names, project details, order history, references, or independently verifiable case descriptions are provided.
Product Q&A
Q:Are you a factory or trader?
A:
We are a factory, a manufacturer with more than ten years of experience.
Q:What is the delivery time?
A:
About 10 to 20 days after deposit.
Q:What are the payment modes?
A:
Normally by T/T and L/C, but it is negotiable.
Q:Is sample available?
A:
Yes, sample is available.
Q:What is the MOQ?
A:
The Minimum Order Quantity is 25 metric tons.
Send Inquiry
*To:
Tangshan Wufang Industry Co., Ltd.
Tangshan Wufang Industry Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Bythai Scaffolding Tubes BS1139 Galvanized Steel Pipe and Tube with Best Price Galvanized Tubes From China
US$4.50-8.50
1,000 Pieces(MOQ)
BS1139 Scaffolding Steel Pipe ERW Black and Galvanized Steel Tube for Tubular System Scaffold
US$700.00-1,000.00
1 Ton(MOQ)
Scaffolding Pipe BS1139 1.5 Inch Scaffolding Building ERW Ms Steel Pipe and Tube 48.3mm - 48.6mm
US$10.00-12.00
10 Pieces(MOQ)
Tubes and Pipes Scaffolding Tube Zinc Coated Carbon Steel Hot Dipped Galvanized Steel ASTM Q235
US$10.00-12.00
10 Pieces(MOQ)
BS1139 En39 48.3mm Galvanized Scaffolding Tube and BS1139 2 Inch Scaffold Tube
US$8.80-15.00
1,000 Pieces(MOQ)
BS1139 ERW Hot Dipped Galvanized Steel Construction Pipe Scaffolding Tube System
US$800.00
25 Tons(MOQ)
Scaffolding Material Construction Pipe BS1139 Steel Galvanized Tube 48.3mm
US$1,030.00
25 Tons(MOQ)
Building Construction En74 Steel BS1139 Hot Dipped Galvanized Black Scaffolding Pipe Steel Tube
US$12.00-13.00
100 Pieces(MOQ)
Hot DIP Galvanized Scaffolding Pipe BS1139 Steel Tube for Construction
US$700.00-1,000.00
1 Ton(MOQ)
48.3mm Galvanized Steel Pipe Q235B Q355b Scaffolding Tube BS1139 Steel Tube on Sale
US$700.00-1,000.00
1 Ton(MOQ)
Galvanized Steel Scaffolding Pipe Gi Round Tube
US$800.00
25 Tons(MOQ)
Hot DIP Galvanized Steel Scaffolding Gi Pipe Galvanized Tube for Construction
US$1,030.00
25 Tons(MOQ)
Easy Round/Hollow Section Hot DIP Galvanized Metal Gi Pipes Scaffolding Tube
US$11.50-13.50
1,000 Pieces(MOQ)
BS1139 En74 Galvanized Scaffold Pipe Scaffolding Tube for Sale
US$5.00-30.00
100 Pieces(MOQ)
Easy Scaffolding Hot Dipped Galvanized Round Steel Pipe/Gi Pipe/Galvanised Tube
US$6.99
500 Pieces(MOQ)
British Standard 48.3mm Scaffolding Pipe and Tube with BS En 39 BS 1139
US$15.00
244 Pieces(MOQ)



















