Powered by Made-in-China.com
Heavy-Duty Galvanized HDG Scaffolding Tube for Construction Projects
US$900.00-1,200.00
10 Tons
Product profile
Customization
AvailableAfter-sales Service
24 Hours Full Time ServiceWarranty
One YearMaterial
SteelType
FixedSupporting Mode
Projecting ScaffoldingErection Position
External ScaffoldingConstruction Properties
Building ScaffoldTransport Package
by BundleTrademark
WufangOrigin
ChinaHS Code
7308400000Production Capacity
10000 Tons/MonthKey features
Customizable Length: Length can be customized from 1 to 8 meters to meet specific project needs.
Hot Galvanized Material: Made from Q235 hot galvanized steel tube for superior corrosion resistance.
Multi-Angle Connection: Scaffolding pipes can be jointed together at any angle with the right coupler.
Versatile Application: Ideal for both outside masonry construction and inside concrete support.
Certified Quality: Meets BS1139/EN74 standards with SGS, ISO, BV, CE, and CQC certificates.
24-Hour Support: Provides 24 hours full-time after-sales service for all inquiries.
Plastic Caps Included: Optional plastic caps available for both ends of the tube for safety.
OEM Service Available: Full customization, minor customization, and design-based customization supported.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤3.16h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with 110 employees and a broad product scope centered on scaffolding, supports, steel formwork, and related metal products. It reports substantial annual capacity for ringlock scaffolding, frame scaffolding, shoring props, and steel formwork, supported by documented finished-product inspection procedures. Customization, OEM, ODM, and recent new-product activity are indicated. Service controls include documented complaint handling, corrective and preventive actions, supplier assessment, and quality assurance procedures. However, no overseas warehouse, showroom, agents or branches, or offline trade-show participation are reported, and no SDK is available. The provided information does not establish certifications, financial strength, or specific customer cases.
Supplier typeThe supplier is identified as a limited company with a combined company type, is not an offshore company, and is not part of a larger company group. Its 110 employees and stated metal-structure manufacturing and sales activities indicate an operating manufacturing entity rather than only a trading profile.
After-Sales capabilityThe supplier has documented complaint-handling and corrective/preventive-action procedures with records, and reports one-month lead times in both peak and off-season periods. It can provide training, but it has no overseas warehouse, showroom, agents, or branches, and reports service coverage in zero countries, limiting demonstrated overseas after-sales infrastructure.
R&D capabilityThe supplier reports new products during the past year and provides ODM services, supporting active product development. However, it reports no available SDK, so the evidence supports product innovation but not software-development integration capability.
Production capacityReported annual capacity includes 150,000 tons of ringlock scaffolding, 150,000 frame-scaffolding sets, 500,000 shoring-prop sets, and 12,000 tons of steel formwork. The supplier also reports valid manufacturing contracts with associated subcontractors, in-stock capability, inspection instructions that are uniformly followed, and written supplier-service assessment procedures.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, and minor customization. It also reports OEM service for well-known brands and ODM service, indicating broad product-development and manufacturing adaptation capability.
Product Q&A
Q:Are you factory or trader?
A:
We are factory, manufacturer more than ten years.
Q:How about your delivery time?
A:
About 10 to 20 days after deposit.
Q:How about your payment mode and sample?
A:
Normally by T/T and L/C, it's negotiable.
Send Inquiry
*To:
Tangshan Wufang Industry Co., Ltd.
Tangshan Wufang Industry Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy Duty Scaffolding Steel Tubes Welded Scaffold Tubes for Construction Project
US$4.90-10.00
1,000 Pieces(MOQ)
Heavy Weight Ringlock Scaffolding, Galvanized, 48.3mm Tube for Durability
US$20.00-50.00
1,000 Pieces(MOQ)
Scaffolding Building Materials Scaffold Tube Galvanized for Construction
US$10.00-12.00
10 Pieces(MOQ)
Hot DIP Galvanized Steel Pipes Scaffolding Tubes for Oil Petroleum Construction
US$10.00-12.00
10 Pieces(MOQ)
Pre Galvanized HDP Steel Pipe Scaffolding Tube for Construction
US$10.00-12.00
10 Pieces(MOQ)
Heavy-Duty Scaffolding 1.5m to 2m Height, 42mm Main Tube
US$25.00-35.00
500 Pieces(MOQ)
Factory Direct Sale Construction Galvanized Scaffolding Steel Pipe Tube for British Market
US$650.00-1,000.00
1 Ton(MOQ)
Heavy Duty Durable Construction Galvanized and Powder Coated Adjustment Scaffold Tube
US$5.00-8.10
1 Piece(MOQ)
Heavy Duty Extendable Leg Support Pipe Adjustable Scaffolding Support Tube
US$8.00-14.00
10 Pieces(MOQ)
Hot DIP Galvanized Scaffolding Pipe BS1139 Steel Tube for Construction
US$700.00-1,000.00
1 Ton(MOQ)
Premium Galvanized Ringlock Scaffolding, 48.3mm Tube for Safety
US$5.60-16.80
1,000 Pieces(MOQ)
Heavy Duty Extendable Leg Support Concrete Formwork and Scaffolding Support Tube
US$5.00-8.10
1 Piece(MOQ)
Heavy Duty BS1139 Scaffolding Tubes for Reliable Construction
US$7.00-8.00
500 Pieces(MOQ)
BS1139 Scaffolding Hot DIP Galvanize Pipe HDG Steel Tube for Construction
US$500.00-700.00
1 Ton(MOQ)
Factory Price HDG Galvanized Tubes /Fitting Steel Tube for Scaffolding
US$500.00-800.00
20 Tons(MOQ)
Hot DIP Galvanized Steel Scaffolding Gi Pipe Galvanized Tube for Construction
US$1,030.00
25 Tons(MOQ)
Q235 Construction Scaffolding Pipe HDG Galvanized Tube Gi Pipe Scaffolding Tube
US$15.00
244 Pieces(MOQ)



















