SourcingAI
Try for free
Powered by Made-in-China.com
HD200 Bailey Bridge - Ideal Steel Structure for Emergency and Highway Applications
US$900.00-1,350.00
1 Ton

Product profile

Customization

Available

After-sales Service

1 Year

Scale

Middle Bridge

Model NO.

pedestrian bridge

Usage

Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct, Supporting System

Installation Method

Bolted Connection / Modular Assembly

Structure Type

Steel Truss Structure

Bridge Application

Highway, Emergency, Temporary Access, Construction

Life

Semi-Permanent Bridge

Lane Position

Half Through Bridge

Material

Steel Bridge

Surface Treatment

Painting, Galvanized

MOQ

1 PC

Certification

GB, ASTM

Across Way

Open Bridge

Stress Characteristics

Beam Bridge

Product Name

Urban Flyover,Sidewalk,Steel Structure Footbridge

Delivery Detail

According to The Order

Packing

40' Standard Hq Containers

Supply Ability

60000 Ton/Tons Per Year

Transport Package

Transported by Container/Truck in Strong Packing

Specification

pedestrian bridge

Trademark

TUOTIAN BAILEY

Origin

China

HS Code

7308100000

Production Capacity

100000pieces/Years

Key features

Modular Design: Fast assembly, dismantling, and transportation with standardized components.
Customizable Dimensions: Bridge length, width, deck configuration, and load capacity adapted to project needs.
High Load Capacity: Supports 40T to 80T truck and trailer loads with high structural stability.
Long Service Life: Designed for 20-50 years of operation depending on environment and maintenance.
On-Site Installation Support: Complete technical consultation, design support, and installation guidance provided.
Corrosion Resistance: Available with hot-dip galvanized or painted surface treatments for durability.
Direct Factory Supply: Competitive pricing and stable quality from manufacturer without middlemen.
Global Export Experience: 13 years of experience supplying projects in South America, Asia, Africa, and more.

Company profile

Hunan Tuotian Road & Bridge Engineering Machinery Co., Ltd.
Importers and ExportersCustomization from DesignsStandardized quality controlManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 2019-03-11Nearest Port: Guangzhou Port, Shanghai PortAverage Response Time: ≤1.87h

About Our Factory & Business Background

AddressChangfu Project Area, Guiyang Industrial Park, Chenzhou, Hunan, China
Plant Area7700 square meters
Terms of PaymentLC, T/T, PayPal
International Commercial Terms(Incoterms)FOB, EXW, DAP, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsSteel Bailey, Bailey Bridge, Prefabricated Bridge, Steel Bailey Bridge
Production MachinesSawing and Cutting Machine, Sawing and Cutting Machine, Drilling Machine, Punching Press, 4-Spindle Boring Machine, Dip Tank
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2014-08-05
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice50%~80%

Product Q&A

Q:How can I get a quotation?
A:
Please send us the required bridge span, width, load capacity, project location and quantity. Our engineers will evaluate your requirements and provide a suitable quotation.
Q:Can you provide customized bridge solutions?
A:
Yes. We can provide customized bridge solutions according to the required span, width, load capacity, project conditions and application requirements.
Q:Do you provide technical support and installation guidance?
A:
Yes. We provide technical consultation, installation guidance and engineering support throughout the project. On-site installation services can also be discussed according to project requirements.
Q:How do you ship Bailey Bridges internationally?
A:
We provide international shipping support and can arrange suitable packaging and transportation solutions according to the destination, bridge quantity and project requirements.
Q:What is the delivery time?
A:
The delivery time depends on the bridge type, quantity, production schedule and project requirements. We will confirm the estimated delivery time after reviewing your order details.

Send Inquiry

*To:Hunan Tuotian Road & Bridge Engineering Machinery Co., Ltd.Hunan Tuotian Road & Bridge Engineering Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heavy Loading Steel Structure for Steel Bridge
Made-in-China.com
Steel Structure for Bridge to Tanzania
Made-in-China.com