Powered by Made-in-China.com
Gold Recovery Solution for Rock Gold, CIP CIP Cil Processing Plant
US$3,000.00-4,500.00
1 Piece
Product profile
Customization
AvailableType
Gold Processing PlantVoltage
CustomizedModel NO.
1-300tphWeight
CustomizedMaterial
Carbon SteelMaterial Feature
Heat ResistantCertification
ISO9001:2008, ISO9001:2000, CEEnergy Saving
Energy SavingWarranty
1 YearColor
Multi ColorCustomized
CustomizedCondition
NewAfter-sales Service
The Whole Using LifeCapacity
1-300t/HPlace of Origin
Henan, ChinaMachinery Test Report
ProvidedOperating Training
ProvidedVideo Outgoing-Inspection
ProvidedTransport Package
Disassembled TransportSpecification
1-300tphTrademark
TuruiOrigin
ChinaHS Code
8474209000Production Capacity
5000 Sets/YearKey features
Multi-Stage Gold Recovery: Combines crushing, grinding, gravity concentration, and flotation for high efficiency.
Customizable Voltage & Weight: Voltage and weight are fully customized to meet specific project requirements.
Comprehensive After-Sales Support: Free on-site installation guidance and 1-month technical staff support for production.
Certified Quality Assurance: ISO9001:2008, ISO9001:2000, and CE certified with strict pre-delivery testing.
Flexible Customization Options: Offers full customization, minor customization, and flexible design based on samples.
Energy Saving Design: Optimized machinery design ensures significant energy savings during operation.
Fast Delivery Time: Delivery completed within 10 to 30 working days after receiving the deposit.
1-Year Warranty Coverage: Provides a 1-year warranty for all mechanical equipment defects.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤8.56h
About Our Factory & Business Background
AddressNo. 15, Longhai Industrial Park, Zhengzhou, Henan, China
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsRock Crusher, Gold Mining Equipment, Ball Mill, Grinding Equipment, Crushing Equipment, Building Material Equipment
R&D Engineers1 people
Our Industry Experience & Global Business Record
Main MarketsAfrica
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Product Q&A
Q:How is the quality of your products?
A:
Our products are manufactured strictly according to national and international standards, and we take a test on every grinder before delivery.
Q:Is the price of products reliable?
A:
Yes, we are a manufacturer and have the strength to offer the lowest price compared with other dealers. We offer the lowest price possible based on order quantity with an honest attitude.
Q:Will you help with installation and staff training?
A:
Yes, we can send engineers to guide installation and train workers. However, the buyer must bear the technician's round-trip tickets, accommodation, and food.
Q:What are the payment terms?
A:
We usually accept T/T and L/C, but other terms are also workable.
Q:What is the delivery time?
A:
We will complete delivery within 10 to 30 working days after receiving the deposit, customized according to actual customer needs.
Send Inquiry
*To:
HENAN TURUI MACHINERY CO., LTD.
HENAN TURUI MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Gold Ore Beneficiation Complete Activated Carbon Leaching Cil/CIP Gold Processing Plant
US$5,999.00-9,999.00
1 Set(MOQ)
Turnkey Cil Carbon in Leach Gold Processing Plant for Rock Gold Ore Mining in Africa
US$50,000.00-80,000.00
1 Set(MOQ)
Small Scale Rock Gold Processing Plants with Ball Mill for 5-10tph
US$15,000.00
1 Piece(MOQ)
High Recovery Rock Gold Leaching CIP Process Plant for China
US$5,999.00-9,999.00
1 Set(MOQ)
150tpd Gold Ore Desorption Electrolysis Plant for Cil Leaching Processing Zimbabwe
US$30,000.00-40,000.00
1 Piece(MOQ)
Zimbabwe Rock Gold CIP Processing Plant 300tpd Gold Mining Machinery Equipment
US$160,000.00-165,000.00
1 Set(MOQ)
Gold Flotation Processing Plant 90 Tpd for Rock Gold Ore in Mountain Mining Areas
US$19,999.00-29,999.00
1 Piece(MOQ)
120tpd Small Scale Rock Gold Processing Cilgold CIP Leaching Tank Plant Price
US$78,000.00-80,000.00
1 Set(MOQ)
50tpd Gold Ore CIP Extraction Processing Plant High Recovery Gold Mining Equipment
US$3,500.00-25,000.00
1 set(MOQ)
Small Scale CIP Cil Gold Processing Plant with Engineer Tech Support
US$135,000.00
1 Set(MOQ)
Factory Price for 50tpd-1000tpd Activated Carbon Leaching Cil Gold CIP Processing Plant
US$30,000.00-40,000.00
1 Piece(MOQ)
300tpd Rock Gold Refinery Processing Cil CIP Gold Process Plant for Turkey
US$135,000.00
1 Set(MOQ)
Gold Mining Flotation Plant 450 Tpd for Rock and Sulfide Gold Ore Processing
US$19,999.00-29,999.00
1 Piece(MOQ)
Gold Recovery Solution for Rock Gold, CIP Cil Processing Plant
US$50,000.00
1 Piece(MOQ)
Small Scale Advanced CIP/Cil Cyanidation Plant for Gold Recovery From Tailings
US$38,000.00
1 Piece(MOQ)
Professional Customized Solution Rock Gold Recovery Plant
US$3,000.00-4,500.00
1 Piece(MOQ)
High Recovery Chromite Ore Processing Plant for Rock Chrome and Chromite Sand Separation
US$18,000.00
1 Set(MOQ)



















