Powered by Made-in-China.com
Rock Gold Processing Plant with a Small 2-3 Ton/Hour Gold Production Line
US$3,000.00-4,500.00
1 Piece
Product profile
Customization
AvailableType
Gold Processing PlantVoltage
CustomizedModel NO.
1-300tphWeight
CustomizedMaterial
Carbon SteelMaterial Feature
Heat ResistantCertification
ISO9001:2008, ISO9001:2000, CEEnergy Saving
Energy SavingWarranty
1 YearColor
Multi ColorCustomized
CustomizedCondition
NewAfter-sales Service
The Whole Using LifeCapacity
1-300t/HPlace of Origin
Henan, ChinaMachinery Test Report
ProvidedOperating Training
ProvidedVideo Outgoing-Inspection
ProvidedTransport Package
Disassembled TransportSpecification
1-300tphTrademark
TuruiOrigin
ChinaHS Code
8474209000Production Capacity
5000 Sets/YearKey features
Customized Capacity: Flexible capacity options ranging from 1 to 300 tons per hour.
Multi-Color Options: Available in multiple color configurations to suit customer preferences.
Energy Saving Design: Optimized processing line designed for high energy efficiency.
1-Year Warranty: Comprehensive 1-year warranty coverage for all mechanical equipment.
Whole Life Support: Dedicated after-sales service available throughout the entire product lifecycle.
ISO & CE Certified: Products certified with ISO9001:2008, ISO9001:2000, and CE standards.
Heat Resistant Material: Constructed with high-quality carbon steel featuring heat resistance.
Professional Engineering Team: Supported by 8 professional engineers and over 100 skilled workers.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤5.27h
About Our Factory & Business Background
AddressNo. 15, Longhai Industrial Park, Zhengzhou, Henan, China
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsRock Crusher, Gold Mining Equipment, Ball Mill, Grinding Equipment, Crushing Equipment, Building Material Equipment
R&D Engineers1 people
Our Industry Experience & Global Business Record
Main MarketsAfrica
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Product Q&A
Q:How is the quality of your products?
A:
Our products are manufactured strictly according to national and international standards, and we test every grinder before delivery.
Q:Is the price of products reliable?
A:
Yes, as a manufacturer, we offer the lowest prices compared to dealers, with policies to provide the best price based on order quantity.
Q:Will you help with installation and staff training?
A:
Yes, we can send engineers to guide installation and train workers, but the buyer must cover the technician's travel, accommodation, and food costs.
Q:What are the service and payment terms?
A:
We usually accept T/T and L/C, though other terms are workable. We also take pictures of finished products before delivery.
Q:What is the delivery time?
A:
After receiving the deposit, we complete delivery within 10 to 30 working days, customized according to actual customer needs.
Send Inquiry
*To:
HENAN TURUI MACHINERY CO., LTD.
HENAN TURUI MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Low-Investment Gold Trommel 100 Tons/Hour Gold Wash Plant with Heavy-Mineral-Concentration for Desert-Gold-Mining-Equipment
US$35,800.00-38,800.00
1 Set(MOQ)
Hard Rock Gold Mining Equipment 50 Ton Small Gold Processing Plant
US$3,000.00-4,500.00
1 Piece(MOQ)
Less-Energy-Consumption Gold-Trommel-Screen 100 Tons/Hour Placer Gold Wash Plant with Anti-Erosion for Riverbed-Gold-Panning
US$35,800.00-38,800.00
1 Set(MOQ)
Engineer-Guidance Gold-Trommel 100 Tons/Hour Mobile Gold Wash Plant with Material-Washing for Riverbed-Mining
US$35,800.00-38,800.00
1 Set(MOQ)
5 Tons Small Scale Rock Gold Processing Separator Plant Beneficiation Equipment
US$3,000.00
1 Piece(MOQ)
5-10tph Gold Ore Crusher Rock Gold Production and Processing Plant with Gravity
US$15,000.00-16,000.00
1 Piece(MOQ)
5-10tph Small Scale Rock Gold Processing Plants with Ball Mill Jaw Crusher
US$5,000.00-10,000.00
1 Piece(MOQ)
5tph Rock Gold 5 Tons Small Scale Gold Processing Plant for Sale
US$5,000.00-10,000.00
1 Piece(MOQ)
Full Set 5 Tons Small Scale Gravity Separation Gold Processing Machine Plant
US$5,000.00-10,000.00
1 Piece(MOQ)
Small Scale Rock Gold Processing Plants with Ball Mill for 5-10tph
US$15,000.00
1 Piece(MOQ)
Small Rock Gold Beneficiation Processing Plant with Ball Mill for Mining Recovery
US$3,000.00-4,500.00
1 Piece(MOQ)
10 Tons Per Hour Equipment for The Entire Rock Gold Processing Plant
US$3,000.00-4,500.00
1 Piece(MOQ)
10 Tons Per Hour Complete Hard Rock Gold Processing Plant
US$45,000.00-48,000.00
1 Set(MOQ)
Rock Gold Beneficiation Gold Ore Processing Plant Small Scale Gold Processing Line with Ball Mill for Mining Recovery
US$5,000.00-49,999.00
1 Set(MOQ)
High Efficient 5 Tons Small Scale Hard Rock Gold Processing Plant in Albania
US$5,000.00-10,000.00
1 Piece(MOQ)
5tph Rock Gold 5 Tons Small Scale Gold Processing Plant
US$5,000.00-10,000.00
1 Piece(MOQ)
Sudan's Large-Scale Gold Gravity Separation Plant with a Capacity of 100 Tons Per Hour Is Selling Well.
US$8,999.00-9,999.00
1 Piece(MOQ)



















