SummaryTAIZHOU LIZHOU PNEUMATIC TOOLS CO., LTD. is identified as a Chinese manufacturer/factory producing pneumatic and related battery-powered tools. It reports ISO 9000 and ISO 9001 certification, six production lines, 6–10 R&D engineers, and 6–10 quality-control staff. Its product range includes air screwdrivers, impact wrenches, grinders, sanders, pressure guns, tool kits, and customized products. The supplier states that it has an after-sales team and exports to multiple global regions, with exports representing 51%–70% of total sales. Off-peak lead time is within 15 workdays, while peak-season fulfillment may require 2–3 months. The available evidence supports manufacturing capability, quality-system certification, international market experience, and stated after-sales support. However, the slices do not provide independently verifiable customer cases, detailed customization resources, or sufficient evidence to assess financial credibility.
Supplier typeThe supplier is explicitly classified as a Manufacturer/Factory and is named TAIZHOU LIZHOU PNEUMATIC TOOLS CO., LTD., with an operating address in Zhejiang, China. This directly supports its status as a manufacturing supplier.
CertificationsThe supplier reports ISO 9000 and ISO 9001 certification. These stated management-system certifications provide explicit evidence of formal quality-management credentials, although the slices do not include certificate numbers, validity dates, or issuing-body details.
After-Sales capabilityThe company description explicitly states that it has a good after-service team and can guarantee after-sales service. This supports the existence of a stated after-sales capability, although no staffing levels, response times, service locations, or performance records are provided.
Production capacityThe supplier is identified as a factory with six production lines, 6–10 quality-control staff, and 6–10 R&D engineers. Multiple listed pneumatic products and stated off-peak lead time within 15 workdays support active production capability, while the 2–3 month peak-season fulfillment time indicates capacity may be constrained during peak periods.